Aguirre GasPort FSRU
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Aguirre GasPort FSRU is a cancelled (confirmed) LNG import terminal in United States.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Aguirre GasPort FSRU | Guayama, Guayama, United States[1] | 17.974167, -66.11 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Aguirre GasPort FSRU | import[2] | cancelled (confirmed)[3] | 3.8 mtpa[2] | 3.8 mtpa | True | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Aguirre GasPort FSRU | import[2] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Aguirre GasPort FSRU | import[2] | cancelled (confirmed)[3] | – | – | – | – | 2019 (cancelled)[4] |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Aguirre GasPort FSRU | import[2] | cancelled (confirmed)[3] | Excelerate Energy LP [100%][2] | Excelerate Energy Inc [24.3%]; Excelerate Energy Holdings LLC | – |
Background
The project is being developed by the Puerto Rico Electric Power Authority and Excelerate Energy. Excelerate Energy submitted its formal application to FERC in April 2013. On July 24, 2015, FERC issued the order authorizing the construction and operation of the project.[5]
The installation will include a floating storage and regasification unit (FSRU) and submarine lines for gas supply. The complex will provide fuel to the Central Aguirre power plant. It is planned for 2018.[6]
As a result of changed circumstances, the Aguirre Offshore GasPort project, including the liquefied natural gas (LNG) terminal conditionally authorized by the regulator, was cancelled by the company in November of 2019. Excelerate filed in a request to FERC to vacate the authorization for the construction of the facilities that would have included a floating storage and regasification unit (FSRU) with a baseload capacity of 500 mmscf/d, minimal infrastructure to moor the vessel, and a subsea pipeline to deliver the gas onshore.[7]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ http://en.aguirreoffshoregasport.com/the-aguirre-offshore-gasport-project-overview/location-puerto-rico/.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 http://en.aguirreoffshoregasport.com/the-aguirre-offshore-gasport-project-overview/gasport-project-status-and-timeline/.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 https://www.lngworldnews.com/ferc-ends-aguirre-offshore-lng-gasport-process/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.lngworldnews.com/ferc-ends-aguirre-offshore-lng-gasport-process/ https://www.lngworldnews.com/ferc-ends-aguirre-offshore-lng-gasport-process/; https://www.lngworldnews.com/ferc-ends-aguirre-offshore-lng-gasport-process/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ "Project Status and Timeline," Aguirre Offshore Gasport, accessed July 2017
- ↑ "Aguirre Offshore GasPort," BN Americas, accessed July 2017
- ↑ FERC ends Aguirre Offshore LNG GasPort process LNG World News, February 2019