Aiya Solar Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Aiya Solar Project is an announced solar photovoltaic (PV) farm in Moapa, Clark County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Aiya Solar Project
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Announced[1] | 2029 (planned)[2] | 100 MWac[1] | PV[1] | First Solar INC[3] | First Solar INC[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Aiya Solar Project
Location | Coordinates (WGS 84) |
---|---|
Moapa, Clark County, Nevada, United States[2] | 36.6850, -114.6460 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ 2.0 2.1 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. 2023. Retrieved September 29, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 https://renewablesnow.com/news/first-solar-gets-doi-approval-for-100-mw-solar-park-in-nevada-539942/.
{{cite web}}
: Missing or empty|title=
(help)