Ajdovščina – Lucija Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Ajdovščina – Lucija Gas Pipeline is a gas pipeline under construction Slovenia.[1]
Location
The pipeline starts in Adjovscina, Slovenia, and runs to Lucija, Slovenia.[1]
Project Details
- Operator: Plinovodi d.o.o
- Owner: Plinovodi d.o.o
- Parent company: Plinovodi d.o.o[2]
- Capacity:
- Length: 45.9km[1]
- Diameter: 400mm[1]
- Status: Construction[1]
- Start Year: 2025[1][3]
Background
The project was initially set to begin in 2024, however the 2025 Plinovodi Developement Plan listed the projects start sdate as between 2025 and 2028. Right of way procurement for the project was underway in 2024.[4] A facebook post from the Municipality of Sežana indicated that they expected construction work to be underway in their municipality in July 2025.[5]
Resources and articles
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 Plinovodi (2025). "10-letni razvojni načrt prenosnega plinovodnega omrežja 2025-2034" (PDF). Plinovodi. Retrieved 2025-09-08.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Operation of transmission system | Plinovodi d.o.o." www.plinovodi.si. Retrieved 2022-09-22.
- ↑ Plinovodi (October, 2021). "TEN-YEAR GAS TRANSMISSION NETWORK DEVELOPMENT PLAN FOR THE 2022 – 2031 PERIOD" (PDF). Plinovodi. Retrieved Sep 22nd, 2022.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help); line feed character in|title=
at position 26 (help)CS1 maint: url-status (link) - ↑ "Pregled objav 877132". Enarocanje. Retrieved 2025-09-08.
- ↑ "Pričetek del gradnje prenosnega plinovoda M6 na odseku Ajdovščina – Sežana". Občina Sežana (Facebook). Retrieved 2025-09-08.