Aktobe CHP power station (Актобе ТЭЦ) is an operating power station of at least 57-megawatts (MW) in Aktobe, Aktobe, Kazakhstan. It is also known as Aktyubinskaya and Aktubinsk.


Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Aktobe CHP power station Aktobe, Aktobe, Kazakhstan 50.3364, 57.1402 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 7: 50.336398, 57.140192


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 7 operating[2][3][4][5] gas[6] 57 MW[6][2] combined cycle[6][7] yes[6][8] - -

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.


Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 7 Aktobe TPP JSC Aktobe TPP JSC


Financing

| gas[3]

Financing

| combined cycle[3][4]

Financing

| yes[5][3]

Background

As of September 2022, construction of the new gas turbine unit was still ongoing, with the delayed planned start date of January 1st, 2023.[4][2] The installed gas turbine is Siemens SGT-800 which is a hydrogen-ready turbine.[4]

The main generation will be provided by the Siemens SGT-800 industrial gas turbine with a 50 MW electrical power generator. The SGT-800 combines a robust design with high efficiency and low emissions. Due to the high energy of the exhaust, this turbine is effectively used in combined cycles.

Exhaust hot gases (fuel combustion products) from the turbine will go to the waste heat boiler manufactured by Podolsk Machine-Building Plant JSC to generate steam with a pressure of 3.0 MPa and a temperature of 420 ° C in a volume of 70 tons per hour. The resulting medium-pressure superheated steam is sent to the existing steam turbines of the Aktobe CHPP for secondary generation of electricity.[9]

Thus, the use of combined cycle technology guarantees combined energy production and maximum fuel efficiency, and also increases the environmental friendliness and efficiency of the power plant.[9]

The commissioning of the gas treatment and fuel supply system for the new gas turbine unit of Aktobe CHPP - installation supervision, commissioning, individual and integrated tests, as well as training of operating personnel is carried out by specialists from ServiceENERGAS (ENERGAS Group), a Russian manufacturer and supplier of process equipment for gas treatment (upstream, midstream) and gas compression.[9] In November 2022, commissioning of the gas turbine began, and the unit was considered officially launched[10].


Articles and Resources

References

  1. "www.industryabout.com/country-territories-3/2030-kazakhstan/fossil-fuels-energy/31017-aktobe-gas-power-plant". Archived from the original on July 2, 2021.
  2. 2.0 2.1 2.2 "На Актобе ТЭЦ доставлены газокомпрессорные установки для строящегося газотурбинного энергоблока". energybase.ru. Archived from the original on July 9, 2021. Retrieved January 29, 2022. Cite error: Invalid <ref> tag; name "ref_1" defined multiple times with different content
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20220902135015/https://24.kz/ru/news/economyc/item/562117-v-podderzhku-reform-aktobe-tets-stroit-tsekh-parogazovykh-ustanovok. Archived from the original on 2022-09-02. {{cite web}}: Missing or empty |title= (help) Cite error: Invalid <ref> tag; name "ref_2" defined multiple times with different content Cite error: Invalid <ref> tag; name "ref_2" defined multiple times with different content Cite error: Invalid <ref> tag; name "ref_2" defined multiple times with different content
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20221118220942/https://ru.sputnik.kz/20221118/na-stantsii-aktobe-tets-zapustili-gazoturbinnuyu-ustanovku-moschnostyu-57-mvt---29469887.html. Archived from the original on 2022-11-18. {{cite web}}: Missing or empty |title= (help) Cite error: Invalid <ref> tag; name "ref_3" defined multiple times with different content Cite error: Invalid <ref> tag; name "ref_3" defined multiple times with different content Cite error: Invalid <ref> tag; name "ref_3" defined multiple times with different content
  5. 5.0 5.1 https://web.archive.org/web/20230116051432/https://www.inform.kz/ru/na-remont-tec-v-aktobe-napravyat-1-4-mlrd-tenge_a4023392. Archived from the original on 2023-01-16. {{cite web}}: Missing or empty |title= (help) Cite error: Invalid <ref> tag; name "ref_4" defined multiple times with different content
  6. 6.0 6.1 6.2 6.3 "The EDB to finance construction of a gas turbine unit with a waste heat boiler at the Aktobe CHP plant for KZT 16 billion". eabr.org. Archived from the original on July 2, 2021. Retrieved January 29, 2022.
  7. "ЭНЕРГАЗ устанавливает на Актобе ТЭЦ компрессорную станцию топливного газа для нового газотурбинного энергоблока". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
  8. "www.korem.kz/details/ndownload.php?fn=6504&lang=rus". Archived from the original on July 9, 2021.
  9. 9.0 9.1 9.2 "На Актобе ТЭЦ установлена система комплексной подготовки топливного газа для нового газотурбинного энергоблока". eprussia.ru. 2022-03-14.{{cite web}}: CS1 maint: url-status (link)
  10. "На станции Актобе ТЭЦ запустили газотурбинную установку мощностью 57 МВт". SPUTNIK Казахстан. 11/18/2022. Retrieved 04/21/2023. {{cite web}}: Check date values in: |access-date= and |date= (help)CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.