Al-Dur Power and Water Station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Al-Dur Power and Water Station (محطة الدو المستقلة للمياه والطاقة، محطة الدورلإنتاج الكهرباء والمياه) is an operating power station of at least 2726-megawatts (MW) in Al Dur, Southern, Bahrain. It is also known as Aldur IWPP.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Al-Dur Power and Water Station | Al Dur, Southern, Bahrain | 25.96928, 50.60801 (exact)[1][2][3] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1-1, Unit 1-2, Unit 2-1, Unit 2-2: 25.96928, 50.60801
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
Unit 1-1 | operating[4] | gas[4][5] | 613[4][5] | combined cycle[5] | not found | 2012[4] | – |
Unit 1-2 | operating[4] | gas[4][5] | 613[4][5] | combined cycle[5] | not found | 2012[4] | – |
Unit 2-1 | operating[6][7][8][9] | gas[1][10] | 750[1][8] | combined cycle[7] | not found | 2022[6][7] | – |
Unit 2-2 | operating[6] | gas[11] | 750[11] | combined cycle[6] | not found | 2022[6] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1-1 | Al-Dur Power and Water Company (ADPWC)[12] | Engie SA [75.0%]; Gulf Investment Corporation [25.0%] |
Unit 1-2 | Al-Dur Power and Water Company (ADPWC)[5] | Engie SA [75.0%]; Gulf Investment Corporation [25.0%] |
Unit 2-1 | ACWA Power [60%]; Mitsui & Co Ltd [30%]; Almoayyed Contracting Group [10%][1] | ACWA Power [100.0%]; Mitsui & Co Ltd [100.0%]; Almoayyed Contracting Group [100.0%] |
Unit 2-2 | ACWA Power [60%]; Mitsui & Co Ltd [30%]; Almoayyed Contracting Group [10%][1] | ACWA Power [100.0%]; Mitsui & Co Ltd [100.0%]; Almoayyed Contracting Group [100.0%] |
Project-level captive use details
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20210623164923/https://drive.google.com/file/d/1D3ZDtv235TVhW3j7hxEapjMKsoUhlSxy/view. Archived from the original on 23 June 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18634-al-dur-gas-power-plant.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/Al+Dur+2+IWP+Project/@25.969282850.60581831005m/data=!3m1!1e3!4m5!3m4!1s0x3e4857b5d02b4435:0xc414a55f6395fff1!8m2!3d25.9686337!4d50.6083877.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20220224145415/https://www.ewa.bh/en/AboutUs/AnnualReport/statistics%202018.pdf. Archived from the original (PDF) on 24 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 https://web.archive.org/web/20211203100044/https://www.powerengineeringint.com/news/bahrain-fighting-fit/. Archived from the original on 03 December 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 https://web.archive.org/web/20220712152949/https://energy-utilities.com/bahrain-s-1-500mw-aldur-2-iwpp-begins-full-news117784.html. Archived from the original on 12 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 https://web.archive.org/web/20221205011038/https://acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 05 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20210813171549/https://www.ewa.bh/en/Media/PressReleases/the-minister-of-electricity-affairs-and-the-ceo-inspect-the-second-phase-of-the-al-dur-power-and-water-plant. Archived from the original on 13 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220522210830/https://www.nsenergybusiness.com/projects/al-dur-independent-water-and-power-project-phase-ii/. Archived from the original on 22 May 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220819074905/https://www.acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 19 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 https://web.archive.org/web/20220705115630/https://www.idom.com/en/project/al-dur-ii-iwpp-combined-cycle-power-plant-1500-mw/. Archived from the original on 05 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210920043050/http://www.gic.com.kw/al-dur-power-and-water-company/. Archived from the original on 20 September 2021.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.