Al-Dur Power and Water Station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Al-Dur Power and Water Station (محطة الدور المستقلة للمياه والطاقة، محطة الدورلإنتاج الكهرباء والمياه) is an operating power station of at least 2726-megawatts (MW) in Al Dur, Southern, Bahrain with multiple units, some of which are not currently operating. It is also known as Al Dur2 IWPP (units 2-1, 2-2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Al-Dur Power and Water Station Al Dur, Southern, Bahrain 25.969278, 50.608007 (exact)[1][2][3]
Loading map...

Unit-level coordinates (WGS 84):

  • 1-1, 1-2, 2-1, 2-2, 3: 25.969278, 50.608007

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Equipment Emergency/Backup
1-1 Operating[4] fossil gas: natural gas[5][4] 613[5][4] combined cycle[5] not found 2012[4] GE Power: 9FA, GE Power: C7[6][7] no
1-2 Operating[4] fossil gas: natural gas[5][4] 613[5][4] combined cycle[5] not found 2012[4] GE Power: 9FA, GE Power: C7, GE Power: 9FA[6][7] no
2-1 Operating[8][9][10][11] fossil gas: natural gas[3][12] 750[3][11] combined cycle[9] not found 2022[8][9] Siemens Energy: SGT5-4000F, Siemens Energy: SGT5-4000F, Siemens Energy: SST5-5000[10] no
2-2 Operating[8] fossil gas: natural gas[13] 750[13] combined cycle[8] not found 2022[8] Siemens Energy: SST5-5000, Siemens Energy: SGT5-4000F, Siemens Energy: SGT5-4000F[10] no
3 Construction[14][15][16] fossil gas: natural gas[16] 1800[16][17] combined cycle[16] not found 2028 (planned)[16][17] not found no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1-1 Al Ezzel Power Company[5] Engie Energy Services International SA [55%]; ACWA Power Co [45%][5][18] ENGIE SA [55.0%]; ACWA Power Co [45.0%]
1-2 – ACWA Power Co [45%][18] ACWA Power Co [45.0%]
2-1 NOMAC[19] Mitsui & Co Ltd [30%]; Almoayyed Contracting Group WLL [10%]; ACWA Power Co [60%][12][12][12] ACWA Power Co [60.0%]; Mitsui & Co Ltd [30.0%]; Y. K. Almoayyed & Sons BSC [10.0%]
2-2 NOMAC[19] Mitsui & Co Ltd [30%]; Almoayyed Contracting Group WLL [10%]; ACWA Power Co [60%][12][12][12] ACWA Power Co [60.0%]; Mitsui & Co Ltd [30.0%]; Y. K. Almoayyed & Sons BSC [10.0%]
3 – The Electricity and Water Authority [100%][16] The Electricity and Water Authority [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[5]
  • Captive industry: Chemicals[5]
  • Non-industry use: power[5]


Articles and Resources

References

  1. ↑ https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18634-al-dur-gas-power-plant. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://www.google.com/maps/place/Al+Dur+2+IWP+Project/@25.9692828,50.6058183,1005m/data=!3m1!1e3!4m5!3m4!1s0x3e4857b5d02b4435:0xc414a55f6395fff1!8m2!3d25.9686337!4d50.6083877. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 https://web.archive.org/web/20210623164923/https://drive.google.com/file/d/1D3ZDtv235TVhW3j7hxEapjMKsoUhlSxy/view. Archived from the original on 2021-06-23. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20220224145415/https://www.ewa.bh/en/AboutUs/AnnualReport/statistics%202018.pdf. Archived from the original (PDF) on 2022-02-24. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 https://web.archive.org/web/20211203100044/https://www.powerengineeringint.com/news/bahrain-fighting-fit/. Archived from the original on 2021-12-03. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 https://www.ge.com/news/press-releases/ge-energy-signs-contracts-totaling-more-500-million-provide-equipment-services. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 (PDF) https://www.ewa.bh/en/AboutUs/AnnualReport/EWAStatistics2021.pdf. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 8.2 8.3 8.4 https://web.archive.org/web/20220712152949/https://energy-utilities.com/bahrain-s-1-500mw-aldur-2-iwpp-begins-full-news117784.html. Archived from the original on 2022-07-12. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 9.2 https://web.archive.org/web/20221205011038/https://acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 2022-12-05. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.0 10.1 10.2 https://web.archive.org/web/20220522210830/https://www.nsenergybusiness.com/projects/al-dur-independent-water-and-power-project-phase-ii/. Archived from the original on 2022-05-22. {{cite web}}: Missing or empty |title= (help)
  11. ↑ 11.0 11.1 https://web.archive.org/web/20210813171549/https://www.ewa.bh/en/Media/PressReleases/the-minister-of-electricity-affairs-and-the-ceo-inspect-the-second-phase-of-the-al-dur-power-and-water-plant. Archived from the original on 2021-08-13. {{cite web}}: Missing or empty |title= (help)
  12. ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 https://web.archive.org/web/20220819074905/https://www.acwapower.com/en/projects/al-dur2-iwpp/. Archived from the original on 2022-08-19. {{cite web}}: Missing or empty |title= (help)
  13. ↑ 13.0 13.1 https://web.archive.org/web/20220705115630/https://www.idom.com/en/project/al-dur-ii-iwpp-combined-cycle-power-plant-1500-mw/. Archived from the original on 2022-07-05. {{cite web}}: Missing or empty |title= (help)
  14. ↑ https://smartwatermagazine.com/news/smart-water-magazine/bahrain-approves-80-million-funding-shift-al-dur-project-expansion. {{cite web}}: Missing or empty |title= (help)
  15. ↑ "Bahrain announces AlDur Phase 3 IWPP Consultancy services Bid Prices". 2023-05-29. Archived from the original on 2025-03-10. Retrieved 2024-11-14.
  16. ↑ 16.0 16.1 16.2 16.3 16.4 16.5 https://www.zawya.com/en/projects/utilities/bahrain-receives-bids-for-al-dur-phase-3-iwpp-consultancy-tender-pw2gtynn. {{cite web}}: Missing or empty |title= (help)
  17. ↑ 17.0 17.1 https://www.albiladpress.com/news/2023/5504/finance/835416.html. {{cite web}}: Missing or empty |title= (help)
  18. ↑ 18.0 18.1 https://www.acwapower.com/news/acwa-power-completes-acquisition-of-major-power-and-water-desalination-assets-in-bahrain-with-kuwait-to-follow/. {{cite web}}: Missing or empty |title= (help)
  19. ↑ 19.0 19.1 "الرئيسية". nomac-staging.thetribestaging.com. Archived from the original on 2024-03-26. Retrieved 2024-03-25. {{cite web}}: Text "المشروع الأول في البحرين، محطة الدور 2، أبرمت نوماك اتفاقية التشغيل والصيانة" ignored (help)