Al Askar IPP solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Askar Landfill solar
Al Askar IPP solar farm (محطة عسكر للطاقة الشمسية) is a solar photovoltaic (PV) farm under construction in Askar, Askar Landfill, Madinat Khalifa, Southern Governorate, Bahrain.
Project Details
Table 1: Phase-level project details for Al Askar IPP solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Construction[1][2] | 100 MWac[3] | PV[3] | ACWA Power [60%]; Mitsui Group [30%]; Almoayyed Contracting Group [10%][3] | NOMAC[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Al Askar IPP solar farm
Location | Coordinates (WGS 84) |
---|---|
Askar, Askar Landfill, Madinat Khalifa, Southern Governorate, Bahrain[4][5] | 26.0445, 50.6045 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20221003154137/https://renewablesnow.com/news/bahrain-to-build-100-mw-solar-park-on-landfill-site-799928/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://nomac-staging.thetribestaging.com/ar/our-operations/nomac-globally/al-askar-ipp/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://www.nomac.com/en/our-operations/nomac-globally/al-askar-ipp/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://en.wikipedia.org/wiki/Askar.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.nomac.com/en/our-operations/nomac-globally/al-askar-ipp/_Bahrain.
{{cite web}}
: Missing or empty|title=
(help)