Al Aweer H Power and Desalination Station

From Global Energy Monitor
Part of the Global Gas Plant Tracker, a Global Energy Monitor project.
Related categories:

Al Aweer H Power and Desalination Station (محطة العوير "H" المر, also known as DEWA H Station) is a 1996-megawatt (MW) diesel and natural gas power station in the emirate of Dubai, United Arab Emirates.

Location

The map below shows the exact location of the power station in Dubai, United Arab Emirates.

Loading map...

Project Details

  • Owner: Dubai Electricity and Water Authority [100%][1]
  • Parent: Dubai Electricity and Water Authority [100%][2]
  • Location: Dubai, Dubai, United Arab Emirates
  • Coordinates: 25.1493, 55.4268 (exact)[3]
  • Gross generating capacity (operating): 1996 MW
    • Unit 3-GT4: Natural gas and diesel[4] gas turbine[4], 242 MW[1] (start-up in 2008)[5]
    • Unit 3-GT3: Natural gas and diesel[4] gas turbine[4], 242 MW[1] (start-up in 2008)[5]
    • Unit 3-GT2: Natural gas and diesel[4] gas turbine[4], 242 MW[1] (start-up in 2008)[5]
    • Unit 3-GT1: Natural gas and diesel[4] gas turbine[4], 242 MW[1] (start-up in 2008)[5]
    • Unit 2-GT2: Natural gas and diesel[4] gas turbine[4] with CHP[6], 140 MW[1] (start-up in 2006)[7]
    • Unit 2-GT1: Natural gas and diesel[4] gas turbine[4] with CHP[6], 140 MW[1] (start-up in 2006)[7]
    • Unit 1-GT6: Natural gas and diesel[4] gas turbine[3] with CHP[6], 101 MW[1][8] (start-up in 1998)[3][4]
    • Unit 1-GT5: Natural gas and diesel[4] gas turbine[3] with CHP[6], 101 MW[1][8] (start-up in 1998)[3][4]
    • Unit 1-GT4: Natural gas and diesel[4] gas turbine[3] with CHP[6], 101 MW[1][8] (start-up in 1998)[3][4]
    • Unit 1-GT3: Natural gas and diesel[4] gas turbine[3] with CHP[6], 101 MW[1][8] (start-up in 1998)[3][4]
    • Unit 1-GT2: Natural gas and diesel[4] gas turbine[3] with CHP[6], 101 MW[1][8] (start-up in 1998)[3][4]
    • Unit 1-GT1: Natural gas and diesel[4] gas turbine[3] with CHP[6], 101 MW[1][8] (start-up in 1998)[3][4]
    • Unit 2-GT3: Natural gas and diesel[4] gas turbine[4] with CHP[6], 140 MW[1] (start-up in 2006)[7]
  • Gross generating capacity (construction): 815 MW

Articles and Resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 "www.dewa.gov.ae/~/media/Files/About%20DEWA/Annual%20Statistics/DEWA%20statistics_booklet_2019_EN.ashx". Archived from the original on June 23, 2021.
  2. "Dubai Electricity and Water Authority". Wikipedia. December 9, 2021. Archived from the original on June 23, 2021. Retrieved January 20, 2022.
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 "Al Aweer Gas Turbine Power Station 'H'". www.besix.com. Archived from the original on June 23, 2021. Retrieved January 20, 2022.
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 4.24 4.25 "github.com/wri/global-power-plant-database/blob/master/raw_source_files/AUE/Manual%20Of%20Power%20Stations2016.xls?raw=true". Archived from the original on June 24, 2021.
  5. 5.0 5.1 5.2 5.3 "www.constructionweekonline.com/aweer-gas-turbine-power-station-h-phase-3". Archived from the original on June 23, 2021.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 "DEWA awards $300m contract for 4th phase of H-Station in Dubai - World Construction Network". Archived from the original on January 19, 2022. Retrieved January 21, 2022.
  7. 7.0 7.1 7.2 "www.khaleejtimes.com/business/uae-power-grid-contract-to-be-awarded-soon". Archived from the original on June 24, 2021.
  8. 8.0 8.1 8.2 8.3 8.4 8.5 "books.google.com/books?id=uf9NCwAAQBAJ&pg=PT358&lpg=PT358&dq=al+Aweer+%22H%22+607&source=bl&ots=AvCvdg5SSm&sig=ACfU3U01PzonDiOwjdIMbuF2GAZDgd0wTA&hl=en&sa=X&ved=2ahUKEwil27n73NTpAhVNCs0KHbQrAZkQ6AEwAHoECDIQAQ". Archived from the original on July 12, 2021.
  9. 9.0 9.1 9.2 "www.ecgsa.com/project/al-aweer-power-plant-h-station-phase-iv-extension/". Archived from the original on June 25, 2021.
  10. 10.0 10.1 10.2 "www.dewa.gov.ae/en/about-us/media-publications/latest-news/2018/02/4th-phase-of-h-station-at-al-aweer". Archived from the original on June 24, 2021.
  11. 11.0 11.1 11.2 "www.nsenergybusiness.com/news/siemens-to-supply-turbines-for-815mw-unit-h-phase-4-of-al-aweer-power-plant-in-dubai/". Archived from the original on June 23, 2021.
  12. 12.0 12.1 12.2 "Dubai 829MW power project to be commissioned in 2022". Energy & Utilities. Archived from the original on January 19, 2022. Retrieved January 20, 2022.