Alaçati wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Alacati Enda (Phase 2)

Alaçati wind farm is an operating wind farm in Türkiye.

Project Details

Table 1: Phase-level project details for Alaçati wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 7.2 MW[1] Onshore[1] Electricity Generation Company (Türkiye) (Elektrik Üretim AŞ)[1]
2 Operating[2] 2016[2] 16 MW[2] Onshore[1] Egenda Ege Enerji Ür AS [100%][2]

Location

Table 2: Phase-level location details for Alaçati wind farm

Phase Name Location Coordinates (WGS 84)
1 Türkiye[1] 38.288694, 26.377833 (exact)[1]
2 Alaçatı Mahallesi, Izmir, Türkiye[3] 38.2838, 26.3455 (exact)[3]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240125200430/https://www.thewindpower.net/windfarm_en_922_alacati.php. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240125152631/https://app.powerbi.com/view?r=eyJrIjoiNmFmYWY0MTYtNjUyNS00NzQ1LWIwMTMtOTI5ZTNkM2FlYWIxIiwidCI6ImU5YzY0NjU4LWFkMWQtNDUwOS1hODk0LTE2NWZhYjU2NjEyMyIsImMiOjl9. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20210927232006/http://lisans.epdk.org.tr/epvys-web/faces/pages/lisans/elektrikUretim/elektrikUretimOzetSorgula.xhtml. Archived from the original on 27 September 2021. {{cite web}}: Missing or empty |title= (help)