Alamo (Texas) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: OCI Alamo

Alamo (Texas) solar farm is an operating solar photovoltaic (PV) farm in San Antonio, Bexar County, Texas, United States.

Project Details

Table 1: Phase-level project details for Alamo (Texas) solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2013[1] 41 MWac[1] PV[1] OCI Solar Power [100%][2] OCI Solar Power[1]
4 Operating[1] 2014[1] 40 MWac[1] PV[1] Consolidated Edison Development Inc. [100%][3] Consolidated Edison Development Inc.[1]
5 Operating[1] 2015[1] 100 MWac[1] PV[1] Consolidated Edison Development Inc. [100%][3] Consolidated Edison Development Inc.[1]
6 Operating[1] 2017[1] 105 MWac[1] PV[1] BHE Solar LLC [100%][4] BHE Solar[1]
7 Operating[1] 2016[1] 100 MWac[1] PV[1] Consolidated Edison Development Inc. [100%][5] Consolidated Edison Development Inc.[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Alamo (Texas) solar farm

Phase Name Location Coordinates (WGS 84)
1 San Antonio, Bexar County, Texas, United States[1] 29.2717, -98.4447 (exact)[1]
4 Brackettville, Kinney County, Texas, United States[6] 29.3180, -100.3880 (exact)[6]
5 Uvalde, Uvalde County, Texas, United States[6] 29.2180, -99.7050 (exact)[6]
6 Pecos County, Texas, United States[1] 30.9931, -102.2708 (exact)[1]
7 Haskell County, Texas, United States[1] 33.0401, -99.5525 (exact)[1]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. ↑ https://web.archive.org/web/20240206193616/https://www.bizjournals.com/sanantonio/news/2019/12/23/alamo-1-solar-farm-gets-performance-upgrade.html. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://web.archive.org/web/20240206193732/https://sanantonioreport.org/new-owners-celebrate-alamo-5-largest-solar-farm-of-its-kind-in-north-america/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  4. ↑ https://web.archive.org/web/20220208045922/https://www.bherenewables.com/news_renewables.aspx?tT547UpDtLWs3e82pn3vKA=%3D. Archived from the original on 08 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. ↑ https://web.archive.org/web/20240206193742/https://www.tdworld.com/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 6.2 6.3 "Wiki-Solar Database". 2023-04. Archived from the original on 2024-04-02. Retrieved 2024-02-28. {{cite web}}: Check date values in: |date= (help)