Alarcos solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Alarcos solar farm is an operating solar photovoltaic (PV) farm in Poblete, Ciudad Real, Spain.

Project Details

Table 1: Phase-level project details for Alarcos solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2020[2] 50 MWp/dc[1] PV[1] RWE AG [100%][2] RWE[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Alarcos solar farm

Phase Name Location Coordinates (WGS 84)
1 Poblete, Ciudad Real, Spain[1] 38.936, -3.9897 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240201220859/https://www.pv-magazine.com/2019/01/22/innogy-builds-unsubsidized-50-mw-solar-park-in-spain/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20210124030931/https://www.rwe.com/-/media/RWE/documents/05-investor-relations/2020-Q3/20-12-02-rwe-generation-and-capacity-data-q1-q3-20-extern.pdf. Archived from the original (PDF) on 24 January 2021. {{cite web}}: Missing or empty |title= (help)