Alerion Jimbolia wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Alerion Jimbolia wind farm is a wind farm in Jimbolia, Timis, Banat, Romania.

Project Details

Table 1: Phase-level project details for Alerion Jimbolia wind farm

Phase name Status Nameplate capacity Type Owner
1 Cancelled (inferred January 2023) 58 MW[1] Onshore[1] Alerion Clean Power [100%][1]

Location

Table 2: Phase-level location details for Alerion Jimbolia wind farm

Phase Name Location Coordinates (WGS 84)
1 Jimbolia, Timis, Banat, Romania[1] 45.7999, 20.7115 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240126040116/https://renewablesnow.com/news/alerion-clean-power-obtains-permit-for-58-mw-wind-farm-in-romania-168758/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)