Alta Mesa wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: AM Wind Repower
Alta Mesa wind farm is a wind farm under construction in Riverside County, California, United States.
Project Details
Table 1: Phase-level project details for Alta Mesa wind farm
Phase name | Status | Commissioning year | Retired year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|---|
1&2 | Retired[1] | 1988[2] | 2021[3] | 19 MW[2] | Onshore[2] | Brookfield Renewable Partners[4] | AES CORP[5] |
4 | Cancelled[6] | – | – | 40 MW[6] | Onshore[6] | – | – |
RP-2022 | Construction[7] | – | – | 39 MW[8] | Onshore[2] | Brookfield Renewable Partners[9] | Brookfield Renewable Partners[9] |
Location
Table 2: Phase-level location details for Alta Mesa wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1&2 | Riverside County, California, United States[2] | 33.9384, -116.659 (exact)[2] |
4 | Riverside County, California, United States[6] | 33.9464, -116.663 (exact)[6] |
RP-2022 | Riverside County, California, United States[2] | 33.9384, -116.659 (exact)[2] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ USEia2021ER
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (April 19, 2018). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on December 3, 2021. Retrieved April 9, 2021.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ USEia2021ER
- ↑ https://files.ceqanet.opr.ca.gov/266816-2/attachment/Ys7wOQm-xFB5BCHQeTgwElj92Ibf3RCtR8iPBlvwcclcoG-IQnh9nHcPrrQ8tUMLCCT4pU-TyIW9QvFB0.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.thewindpower.net/windfarm_en_2850.php.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
- ↑ USEia2023
- ↑ https://altamesarepower.brookfieldusprojects.com/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 (PDF) https://planning.rctlma.org/Portals/14/Postings/AltaMesa/WCS00071R10_Alta_Mesa_EA-IS_Draft_for_Public_Release_to_RivCo.pdf.
{{cite web}}
: Missing or empty|title=
(help)