Alta Mesa wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: AM Wind Repower

Alta Mesa wind farm is a wind farm under construction in Riverside County, California, United States.

Project Details

Table 1: Phase-level project details for Alta Mesa wind farm

Phase name Status Commissioning year Retired year Nameplate capacity Type Owner Operator
1&2 Retired[1] 1988[2] 2021[3] 19 MW[2] Onshore[2] Brookfield Renewable Partners[4] AES CORP[5]
4 Cancelled[6] 40 MW[6] Onshore[6]
RP-2022 Construction[7] 39 MW[8] Onshore[2] Brookfield Renewable Partners[9] Brookfield Renewable Partners[9]

Location

Table 2: Phase-level location details for Alta Mesa wind farm

Phase Name Location Coordinates (WGS 84)
1&2 Riverside County, California, United States[2] 33.9384, -116.659 (exact)[2]
4 Riverside County, California, United States[6] 33.9464, -116.663 (exact)[6]
RP-2022 Riverside County, California, United States[2] 33.9384, -116.659 (exact)[2]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. USEia2021ER
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (April 19, 2018). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on December 3, 2021. Retrieved April 9, 2021.{{cite web}}: CS1 maint: multiple names: authors list (link)
  3. USEia2021ER
  4. https://files.ceqanet.opr.ca.gov/266816-2/attachment/Ys7wOQm-xFB5BCHQeTgwElj92Ibf3RCtR8iPBlvwcclcoG-IQnh9nHcPrrQ8tUMLCCT4pU-TyIW9QvFB0. {{cite web}}: Missing or empty |title= (help)
  5. https://www.thewindpower.net/windfarm_en_2850.php. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  7. USEia2023
  8. https://altamesarepower.brookfieldusprojects.com/. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 (PDF) https://planning.rctlma.org/Portals/14/Postings/AltaMesa/WCS00071R10_Alta_Mesa_EA-IS_Draft_for_Public_Release_to_RivCo.pdf. {{cite web}}: Missing or empty |title= (help)