Alttrebin Solarpark
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Alttrebin Solarpark is an operating solar photovoltaic (PV) farm in Märkisch-Oderland, Markih-Oderland, Brandenburg, Germany.
Project Details
Table 1: Phase-level project details for Alttrebin Solarpark
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2022[1] | 149 MWp/dc[2] | PV[1] | EnBW[3][4] | EnBW Solar GMBH[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Alttrebin Solarpark
Location | Coordinates (WGS 84) |
---|---|
Märkisch-Oderland, Markih-Oderland, Brandenburg, Germany[2][3] | 52.6937, 14.2391 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 Germany Federal Network Agency (February 2023). "Marktstammdatenregister (Market master data register)". Marktstammdatenregister (Market master data register). Archived from the original on January 23, 2023. Retrieved February 2023.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 2.0 2.1 2.2 2.3 "Aktuelle Einheitenübersicht". MaStR marktstammdatenregister. September 23, 2021. Archived from the original on September 21, 2021. Retrieved October 4, 2021.
- ↑ 3.0 3.1 https://www.enbw.com/company/press/enbw-builds-two-new-solar-parks-in-brandenburg.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.power-technology.com/news/enbw-build-solar-projects-brandenburg-germany/.
{{cite web}}
: Missing or empty|title=
(help)