Aluar El Llano wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Aluar El Llano wind farm (Parque Eólico Aluar El Llano) is an operating wind farm in Departamento Biedma, Chubut Province, Argentina.

Project Details

Table 1: Phase-level project details for Aluar El Llano wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2019[1] 50 MW[1] Onshore[1] Aluar [100%][1] Aluar[1]
2 Operating[2] 2019[2] 61 MW[2] Onshore[1] Aluar [100%][3] Aluar[3]
3 Operating[4] 2020[4] 53 MW[4] Onshore[4] Aluar [100%][4] Aluar[4]
4 Construction[5] 2023 (planned)[6] 81 MW[6] Onshore[6] Aluar [100%][6] Aluar[6]

Location

Table 2: Phase-level location details for Aluar El Llano wind farm

Phase Name Location Coordinates (WGS 84)
1 Departamento Biedma, Chubut Province, Argentina[7] -42.6246, -65.2781 (exact)[7]
2 Departamento Biedma, Chubut Province, Argentina[8] -42.6246, -65.2781 (exact)[8]
3 Departamento Biedma, Chubut Province, Argentina[9] -42.6246, -65.2781 (exact)[9]
4 Departamento Biedma, Chubut Province, Argentina[6] -42.6246, -65.2781 (approximate)[6]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240125161219/https://econojournal.com.ar/2019/02/comenzo-a-operar-un-parque-eolico-de-aluar/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125161255/https://www.elchubut.com.ar/puerto-madryn/2020-8-15-21-29-0-la-segunda-etapa-del-parque-eolico-el-llano-cumple-un-ano. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240130222128/https://www.aluar.com.ar/novedad/primer-a-o-de-operaci-n-de-la-etapa-ii-del-parque-e-lico-aluar. Archived from the original on 30 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20240125161251/https://www.elchubut.com.ar/puerto-madryn/2021-3-25-20-37-0-primer-ano-de-operacion-de-la-etapa-iii-del-parque-eolico-aluar. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240126115326/https://www.evwind.es/2022/12/28/the-iv-stage-of-the-aluar-wind-farm-in-argentina-begins/89489. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 https://web.archive.org/web/20240125161206/https://en.mercopress.com/2022/04/15/aluminum-plant-to-expand-wind-farm-in-argentine-patagonia. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20240131173955/https://www.thewindpower.net/windfarm_en_25284.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20240131173605/https://www.thewindpower.net/windfarm_en_30796.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240131173516/https://www.thewindpower.net/windfarm_en_30797.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)