Aluminium Bahrain (ALBA) power station (محطة ألبا لإنتاج الكهرباء) is an operating power station of at least 3245-megawatts (MW) in Mazrowiah, Southern, Bahrain with multiple units, some of which are not currently operating. It is also known as ALBA Power Station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Aluminium Bahrain (ALBA) power station Mazrowiah, Southern, Bahrain 26.09253, 50.59707 (exact)[1][2][3]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 3-1, Unit 3-2, Unit 4, Unit 5-1, Unit 5-2, Unit 5-3, Unit 5-4: 26.09253, 50.59707

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 3-1 operating[4][5] gas[6][4] 397[7] combined cycle[8] not found not found
Unit 3-2 operating[4][5] gas[6][4] 397[7] combined cycle[8] not found not found
Unit 4 operating[4][5] gas[6][4] 660[9] combined cycle[10] not found 2005[10]
Unit 5-1 operating[11][12][13][5] gas[6][14][4] 597[12][15] combined cycle[14] not found 2019[13][11]
Unit 5-2 operating[11][12][13][5] gas[6][14][4] 597[12][15] combined cycle[14] not found 2019[13][11]
Unit 5-3 operating[11][12][13][5] gas[6][14][4] 597[12][15] combined cycle[14] not found 2019[13][11]
Unit 5-4 construction[16][17][18] gas[19][19][16] 681[19][20][21] combined cycle[16] not found 2024[16]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 3-1 Aluminium Bahrain B.S.C[22] Bahrain Mumtalakat Holding Company [69.4%]; SABIC Investment Company [20.6%]; other [10.0%]
Unit 3-2 Aluminium Bahrain B.S.C[22] Bahrain Mumtalakat Holding Company [69.4%]; SABIC Investment Company [20.6%]; other [10.0%]
Unit 4 Aluminium Bahrain B.S.C[22] Bahrain Mumtalakat Holding Company [69.4%]; SABIC Investment Company [20.6%]; other [10.0%]
Unit 5-1 Aluminium Bahrain B.S.C[22] Bahrain Mumtalakat Holding Company [69.4%]; SABIC Investment Company [20.6%]; other [10.0%]
Unit 5-2 Aluminium Bahrain B.S.C[22] Bahrain Mumtalakat Holding Company [69.4%]; SABIC Investment Company [20.6%]; other [10.0%]
Unit 5-3 Aluminium Bahrain B.S.C[22] Bahrain Mumtalakat Holding Company [69.4%]; SABIC Investment Company [20.6%]; other [10.0%]
Unit 5-4 Aluminium Bahrain B.S.C[22] Bahrain Mumtalakat Holding Company [69.4%]; SABIC Investment Company [20.6%]; other [10.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[23]
  • Captive industry: Aluminum[23]


Articles and Resources

References

  1. https://web.archive.org/web/20211017033132/https://www.albasmelter.com/Contact/Pages/default.aspx. Archived from the original on 17 October 2021. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20210813155839/https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18638-alba-3ab-gas-power-plant. Archived from the original on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20210813171448/https://www.industryabout.com/country-territories-3/1323-bahrain/fossil-fuels-energy/18639-alba-4ab-gas-power-plant. Archived from the original on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 https://web.archive.org/web/20211017032005/https://www.albasmelter.com/Range/OProducts/Pages/Power.aspx. Archived from the original on 17 October 2021. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20221006175919/https://www.albasmelter.com/About%20Alba/Factsfigures/Pages/default.aspx. Archived from the original on 06 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20220709112509/https://www.alayam.com/alayam/economic/926828/News.html. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 (PDF) https://web.archive.org/web/20210813155521/https://www.nexi.go.jp/environment/info/pdf/eia_17-042_04.pdf. Archived from the original (PDF) on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20210813160101/https://www.alstom.com/press-releases-news/2005/11/ALSTOM-wins-gas-turbine-upgrade-order-for-Alba-Power-Plant-Bahrain-20051118. Archived from the original on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20210813155629/https://www.albawaba.com/business/bahrain-second-gas-turbine-delivered-alba%E2%80%99s-new-660-mw-power-station-4. Archived from the original on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20210813171330/https://www.albawaba.com/business/alba-completes-first-major-foundation-line-5-expansion. Archived from the original on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20210813172315/https://www.zawya.com/mena/en/press-releases/story/Alba_line_6_performs_above_expectations-ZAWYA20191229114625/. Archived from the original on 13 August 2021. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 12.3 12.4 12.5 https://web.archive.org/web/20211210103455/https://www.albasmelter.com/mc/News/Pages/2018/Alba-Power-Expansion-Project-achieves-First-Fire-Milestone.aspx. Archived from the original on 10 December 2021. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 https://web.archive.org/web/20220617202426/https://www.albasmelter.com/About%20Alba/Pages/Line6.aspx. Archived from the original on 17 June 2022. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 https://web.archive.org/web/20171218002330/https://www.esbinternational.ie/our-solutions/case-studies/2016/09/14/aluminium-bahrain-alba-pot-line-6-expansion-power-station-5. Archived from the original on 18 December 2017. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 https://web.archive.org/web/20220930153956/https://www.ge.com/gas-power/resources/case-studies/alba-signs-multiyear-agreement. Archived from the original on 30 September 2022. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 16.3 https://web.archive.org/web/20220517061203/https://www.alcircle.com/news/alba-inks-agreement-with-mitsubishi-power-and-sepco-iii-to-construct-block-4-at-power-station-5-80444. Archived from the original on 17 May 2022. {{cite web}}: Missing or empty |title= (help)
  17. https://web.archive.org/web/20221114133639/https://www.zawya.com/ar/%D8%A7%D9%84%D8%A8%D9%8A%D8%A7%D9%86%D8%A7%D8%AA-%D8%A7%D9%84%D8%B5%D8%AD%D9%81%D9%8A%D8%A9/%D8%A8%D9%8A%D8%A7%D9%86%D8%A7%D8%AA-%D8%A7%D9%84%D8%B4%D8%B1%D9%83%D8%A7%D8%AA/%D8%A7%D9%84%D8%A8%D8%A7-%D8%AA%D8%B9%D9%84%D9%86-%D8%B9%D9%86-%D8%A7%D9%84%D8%A5%D8%BA%D9%84%D8%A7%D9%82-%D8%A7%D9%84%D9%86%D8%A7%D8%AC%D8%AD-%D9%84%D8%AA%D9%85%D9%88%D9%8A%D9%84-%D9%85%D8%B4%D8%B1%D9%88%D8%B9-%D9%85%D8%AC%D9%85%D8%B9-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B1%D8%A7%D8%A8%D8%B9-%D8%A8%D9%85%D8%AD%D8%B7%D8%A9-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%AE%D8%A7%D9%85%D8%B3%D8%A9-jqd7q9o2. Archived from the original on 14 November 2022. {{cite web}}: Missing or empty |title= (help)
  18. https://web.archive.org/web/20230323202352/https://www.zawya.com/en/projects/utilities/albas-ps-5-block-4-project-on-track-for-2024-handover-in-bahrain-op656adp. Archived from the original on 23 March 2023. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 https://www.alayam.com/online/Economy/961407/News.html?utm_campaign=magnet&utm_source=article_page&utm_medium=related_articles. {{cite web}}: Missing or empty |title= (help)
  20. https://web.archive.org/web/20220626105305/https://www.albasmelter.com/en/category/power-station-5-block-4-expansion-project. Archived from the original on 26 June 2022. {{cite web}}: Missing or empty |title= (help)
  21. https://web.archive.org/web/20230322221821/https://www.tradearabia.com/news/IND_407639.html. Archived from the original on 22 March 2023. {{cite web}}: Missing or empty |title= (help)
  22. 22.0 22.1 22.2 22.3 22.4 22.5 22.6 https://web.archive.org/web/20240124233155/https://www.japantimes.co.jp/country-report/2019/06/26/global-insight/bahrain-report-2019/leading-world-aluminum/. Archived from the original on 24 January 2024. {{cite web}}: Missing or empty |title= (help)
  23. 23.0 23.1 https://web.archive.org/web/20220709111244/https://www.albasmelter.com/en/article/alba-chairman-visits-power-stations-3-and-5. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.