Amari hydroelectric plant is a hydroelectric power plant in pre-construction in Rethymno Regional Unit, Region of Crete, Greece.

Project Details

Table 1: Project details for Amari hydroelectric plant

Status Nameplate capacity Turbines Technology type Owner
Pre-construction[1][2] 132 MW[1][3] 3[3] Pumped storage[3] Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2]

Location

Table 2: Location details for Amari hydroelectric plant

Location Coordinates (WGS 84)
Rethymno Regional Unit, Region of Crete, Region of Crete, Greece[3] 35.2806, 24.5712 (exact)[3]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 https://balkangreenenergynews.com/terna-energy-to-make-pumped-storage-wind-power-hybrid-in-amari-in-crete/. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://web.archive.org/web/20221108132055/https://balkangreenenergynews.com/amari-hybrid-power-plant-in-crete-becomes-greeces-strategic-investment-project/. Archived from the original on 2022-11-08. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20230213084117/https://www.terna-energy.com/restories-en/the-largest-hybrid-project-to-produce-clean-energy-in-europe/. Archived from the original on 2023-02-13. {{cite web}}: Missing or empty |title= (help)