Amari hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Other names: Amari (Potamoi)
Amari hydroelectric plant is a hydroelectric power plant in pre-construction in Rethymno Regional Unit, Region of Crete, Greece.
Project Details
Table 1: Project details for Amari hydroelectric plant
| Status | Nameplate capacity | Turbines | Technology type | Owner |
|---|---|---|---|---|
| Pre-construction[1][2] | 132 MW[1][3] | 3[3] | Pumped storage[3] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
Location
Table 2: Location details for Amari hydroelectric plant
| Location | Coordinates (WGS 84) |
|---|---|
| Rethymno Regional Unit, Region of Crete, Region of Crete, Greece[3] | 35.2806, 24.5712 (exact)[3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://balkangreenenergynews.com/terna-energy-to-make-pumped-storage-wind-power-hybrid-in-amari-in-crete/.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://web.archive.org/web/20221108132055/https://balkangreenenergynews.com/amari-hybrid-power-plant-in-crete-becomes-greeces-strategic-investment-project/. Archived from the original on 2022-11-08.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20230213084117/https://www.terna-energy.com/restories-en/the-largest-hybrid-project-to-produce-clean-energy-in-europe/. Archived from the original on 2023-02-13.
{{cite web}}: Missing or empty|title=(help)
