Amherst Island wind farm is an operating wind farm in Loyalist, Lennox and Addington County, Eastern Ontario, Ontario, Canada.
Project Details
Table 1: Phase-level project details for Amherst Island wind farm
Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|
Operating[1][2] | 2018[3] | 75 MW[3] | Onshore | Windlectric Inc[2] | Windlectric Inc[2] |
Location
Table 2: Phase-level location details for Amherst Island wind farm
Location | Coordinates (WGS 84) |
---|---|
Loyalist, Lennox And Addington County, Eastern Ontario, Ontario, Canada[3] | 44.1239, -76.7293 (exact)[3] |
The map below shows the exact location of the wind farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ "Amherst Island (Canada)". The Wind Power. Archived from the original on November 19, 2021. Retrieved November 29, 2021.
- ↑ 2.0 2.1 2.2 "Windlectric Inc". Archived from the original on August 8, 2020. Retrieved November 29, 2021.
- ↑ 3.0 3.1 3.2 3.3 "Canadian Wind Turbine Database". Government of Canada. 2020-06-19. Retrieved October 15, 2021.
{{cite web}}
: CS1 maint: url-status (link)