Anemus wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Anemus wind farm (Complexo Eólico Anemus) is an operating wind farm in Currais Novos , Rio Grande do Norte, Brazil.

Project Details

Table 1: Phase-level project details for Anemus wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2023[1] 37.8 MW[1] Onshore[2] 2W Energia [100%][3] 2W Energia[4]
2 Operating[1] 2023[1] 46.2 MW[1] Onshore[2] 2W Energia [100%][3] 2W Energia[4]
3 Operating[5] 2023[6] 54.6 MW[5] Onshore[2] 2W Energia [100%][3] 2W Energia[4]

Location

Table 2: Phase-level location details for Anemus wind farm

Phase Name Location Coordinates (WGS 84)
1 Currais Novos , Rio Grande do Norte, Brazil[1] -6.2627, -36.5173 (exact)[1]
2 Currais Novos , Rio Grande do Norte, Brazil[1] -6.2627, -36.5173 (exact)[1]
3 Currais Novos , Rio Grande do Norte, Brazil[1] -6.2627, -36.5173 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "SIGA - Sistema de Informações de Geração da ANEEL". Dados Abertos. 2025-01-06. Archived from the original on 2025-01-06. Retrieved 2025-01-06.
  2. ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 https://web.archive.org/web/20240131084119/https://www.canalenergia.com.br/noticias/53184891/2w-energia-inicia-construcao-do-complexo-eolico-anemus. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240130222516/https://clickpetroleoegas.com.br/construcao-de-novo-complexo-eolico-e-iniciada-no-rio-grande-do-norte-empreendimento-tera-capacidade-de-1386-mw/. Archived from the original on 2024-01-30. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 Agência Nacional de Energia Elétrica - ANEEL (2024-02-10). "SIGA - Sistema de Informações de Geração da ANEEL". Dados Abertos. Retrieved 2024-09-18. {{cite web}}: Check |archive-url= value (help)
  6. ↑ https://www.weg.net/institutional/US/en/news/products-and-solutions/weg-announces-agreement-with-2w-ecobank-for-self-production-of-wind-power. {{cite web}}: Missing or empty |title= (help)