Anlong Baishui River Stage 2 hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Anlong Baishui River Stage 2 hydroelectric plant (安龙县白水河二级水电站) is an operating hydroelectric power plant in Dewo, Anlong, Qianxinan AP, Guizhou, China.
Project Details
Table 1: Project details for Anlong Baishui River Stage 2 hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
|---|---|---|---|---|---|
| Operating[1] | 2000[1] | 34 MW[2] | 2 x 17 MW[2] | Run-of-river[2] | Guizhou Zhongxing Power Development Co Ltd (贵州中兴电力发展有限公司)[2] |
Location
Table 2: Location details for Anlong Baishui River Stage 2 hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Dewo, Anlong, Qianxinan AP, Guizhou, China[1] | Baishui River[1] | 25.0325, 105.2895 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 http://www.gzal.gov.cn/xwzx/alyw/202506/t20250626_88192004.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://baike.baidu.com/item/%E7%99%BD%E6%B0%B4%E6%B2%B3%E4%BA%8C%E7%BA%A7%E6%B0%B4%E7%94%B5%E7%AB%99/5996008?fr=aladdin.
{{cite web}}: Missing or empty|title=(help)
