Antlia wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Antlia wind farm is a wind farm in pre-construction in Seròs, Segrià, Cataluña, Spain.

Project Details

Table 1: Phase-level project details for Antlia wind farm

Status Nameplate capacity Type Owner Operator
Pre-construction[1] 50 MW[1] Onshore[1] Statkraft AS[2] Desarrollos Renovables Iberia Pi SL[1]

Location

Table 2: Phase-level location details for Antlia wind farm

Location Coordinates (WGS 84)
Seròs, Segrià, Cataluña, Spain[1] 41.4637, 0.4119 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://mediambient.gencat.cat/web/.content/home/ambits_dactuacio/avaluacio_ambiental/energia_eolica/documents/ParcsEolics_ParcsSolars_DLL.xlsx. {{cite web}}: Missing or empty |title= (help)
  2. https://www.somgarrigues.cat/noticies/5488/aerogeneradors-que-s-autoexclouen. {{cite web}}: Missing or empty |title= (help)