Aparse Sonora solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Aparse Sonora solar farm (local name: Parque Solar Aparse Sonora) is a solar farm under construction in Agua Prieta, Sonora, Mexico.
Project Details
The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)
Table 1: Phase-level project details for Aparse Sonora solar farm
Status | Commissioning year | Nameplate capacity | Operator |
---|---|---|---|
Construction[1] | 2021[2] | 24 MWp/dc[1] | Aparse, S. A. de C. V[3] |
Location
Table 2: Phase-level location details for Aparse Sonora solar farm
Location | Coordinates (WGS 84) |
---|---|
Agua Prieta, Sonora, Mexico[3] | 31.3098, -109.544 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "miranda-gr.com/wp-content/uploads/2020/11/COXA-Initation-of-Coverage.pdf" (PDF). Archived from the original (PDF) on August 13, 2021. Retrieved December 13, 2021.
- ↑ "files.coxenergyamerica.com/General/2021-03-11-34-CEA-Presentacion-corporativa-2020-11-EN.pdf" (PDF). Archived from the original (PDF) on August 13, 2021. Retrieved December 13, 2021.
- ↑ 3.0 3.1 3.2 "www.gob.mx/cms/uploads/attachment/file/133529/INFO_PAGINA_2016-07-31_-_1TablaPermisos.pdf" (PDF). Archived from the original (PDF) on August 13, 2021. Retrieved December 13, 2021.