Arada-Montemuro wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: A-M wind farm, Parque Eólico de Arada-Montemuro
Arada-Montemuro wind farm is an operating wind farm in Viseu, Portugal.
Project Details
Table 1: Phase-level project details for Arada-Montemuro wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|---|
Arada | Operating[1] | 2008[1] | 50[1][2] | Onshore | Guild Investments LTD [50%]; Finerge SA [50%][3][4] | Eólica da Arada SA[2] |
Aveloso | Operating[5] | 2008[5] | 6[5] | Onshore | ||
Cabria | Operating[5] | 2015[5] | 9[5] | Onshore | ||
Carvalhosa | Operating[1] | 2008[1] | 22[1][2] | Onshore | Guild Investments LTD [50%]; Finerge SA [50%][3][4] | Eólica da Arada SA[2] |
Carvalhosa 2a | Operating[5] | 2018[5] | 5[5] | Onshore | ||
Manhouce 2a | Operating[5] | 2018[5] | 5[5] | Onshore | ||
Picão | Operating[1] | 2008[1] | 34[1][2] | Onshore | Guild Investments LTD [50%]; Finerge SA [50%][3][4] | Eólica da Arada SA[2] |
Picão 2a | Operating[5] | 2018[5] | 5[5] | Onshore |
Location
Table 2: Phase-level location details for Arada-Montemuro wind farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
Arada | Viseu, Portugal[6] | 40.9654, -8.0294 (exact)[7] |
Aveloso | Portugal | 40.9654, -8.0294 (exact)[8] |
Cabria | Portugal | 40.9654, -8.0294 (exact)[8] |
Carvalhosa | Viseu, Portugal[6] | 40.9654, -8.0294 (exact)[6] |
Carvalhosa 2a | Portugal | 40.9654, -8.0294 (exact)[8] |
Manhouce 2a | Portugal | 40.9654, -8.0294 (exact)[8] |
Picão | Viseu, Portugal[6] | 40.9654, -8.0294 (exact)[8] |
Picão 2a | Portugal | 40.9654, -8.0294 (exact)[8] |
The map below shows the exact location of the wind farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "www.apren.pt/contents/documents/portugal-parques-eolicos-2018.pdf" (PDF). Archived from the original (PDF) on May 16, 2021. Retrieved December 6, 2021.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "siaia.apambiente.pt/AIADOC/AIA1411/RNT1411.pdf" (PDF). Archived from the original (PDF) on December 4, 2021. Retrieved December 6, 2021.
- ↑ 3.0 3.1 3.2 "Arada-Montemuro". EDF Renouvelables. Archived from the original on January 17, 2021. Retrieved December 6, 2021.
- ↑ 4.0 4.1 4.2 "Finerge, Guild Investments Greenlit To Take Control Of Wind Farms In Portugal". Renewables Now. Archived from the original on December 3, 2021. Retrieved December 6, 2021.
- ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 (PDF) https://web.archive.org/web/20220630075400/http://e2p.inegi.up.pt/relatorios/Portugal_parques_eolicos_2021.pdf. Archived from the original (PDF) on June 30, 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 "Arada-Montemuro (Portugal)". The Wind Power. Archived from the original on December 4, 2021. Retrieved December 6, 2021.
- ↑ "Arada-Montemuro (Portugal)". The Wind Power. Archived from the original on December 4, 2021. Retrieved December 6, 2021.
- ↑ 8.0 8.1 8.2 8.3 8.4 8.5 "Arada-Montemuro (Portugal)". The Wind Power. Archived from the original on December 3, 2021. Retrieved December 6, 2021.