Arada-Montemuro wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: A-M wind farm, Parque Eólico de Arada-Montemuro

Arada-Montemuro wind farm is an operating wind farm in Viseu, Portugal.


Project Details

Table 1: Phase-level project details for Arada-Montemuro wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
Arada Operating[1] 2008[1] 50[1][2] Onshore Guild Investments LTD [50%]; Finerge SA [50%][3][4] Eólica da Arada SA[2]
Aveloso Operating[5] 2008[5] 6[5] Onshore
Cabria Operating[5] 2015[5] 9[5] Onshore
Carvalhosa Operating[1] 2008[1] 22[1][2] Onshore Guild Investments LTD [50%]; Finerge SA [50%][3][4] Eólica da Arada SA[2]
Carvalhosa 2a Operating[5] 2018[5] 5[5] Onshore
Manhouce 2a Operating[5] 2018[5] 5[5] Onshore
Picão Operating[1] 2008[1] 34[1][2] Onshore Guild Investments LTD [50%]; Finerge SA [50%][3][4] Eólica da Arada SA[2]
Picão 2a Operating[5] 2018[5] 5[5] Onshore


Location

Table 2: Phase-level location details for Arada-Montemuro wind farm

Phase name Location Coordinates (WGS 84)
Arada Viseu, Portugal[6] 40.9654, -8.0294 (exact)[7]
Aveloso Portugal 40.9654, -8.0294 (exact)[8]
Cabria Portugal 40.9654, -8.0294 (exact)[8]
Carvalhosa Viseu, Portugal[6] 40.9654, -8.0294 (exact)[6]
Carvalhosa 2a Portugal 40.9654, -8.0294 (exact)[8]
Manhouce 2a Portugal 40.9654, -8.0294 (exact)[8]
Picão Viseu, Portugal[6] 40.9654, -8.0294 (exact)[8]
Picão 2a Portugal 40.9654, -8.0294 (exact)[8]

The map below shows the exact location of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "www.apren.pt/contents/documents/portugal-parques-eolicos-2018.pdf" (PDF). Archived from the original (PDF) on May 16, 2021. Retrieved December 6, 2021.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 "siaia.apambiente.pt/AIADOC/AIA1411/RNT1411.pdf" (PDF). Archived from the original (PDF) on December 4, 2021. Retrieved December 6, 2021.
  3. 3.0 3.1 3.2 "Arada-Montemuro". EDF Renouvelables. Archived from the original on January 17, 2021. Retrieved December 6, 2021.
  4. 4.0 4.1 4.2 "Finerge, Guild Investments Greenlit To Take Control Of Wind Farms In Portugal". Renewables Now. Archived from the original on December 3, 2021. Retrieved December 6, 2021.
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 (PDF) https://web.archive.org/web/20220630075400/http://e2p.inegi.up.pt/relatorios/Portugal_parques_eolicos_2021.pdf. Archived from the original (PDF) on June 30, 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 "Arada-Montemuro (Portugal)". The Wind Power. Archived from the original on December 4, 2021. Retrieved December 6, 2021.
  7. "Arada-Montemuro (Portugal)". The Wind Power. Archived from the original on December 4, 2021. Retrieved December 6, 2021.
  8. 8.0 8.1 8.2 8.3 8.4 8.5 "Arada-Montemuro (Portugal)". The Wind Power. Archived from the original on December 3, 2021. Retrieved December 6, 2021.