Aratina Solar Center
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Aratina Solar Center is an announced solar farm in Boron, San Bernardino County, California, United States.
Project Details
Table 1: Phase-level project details for Aratina Solar Center
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Announced[1] | 2023 (planned)[1] | 200 MWac[1] | PV[1] | 8minute Solar Energy[2] | 8minute Solar Energy[2] |
2 | Announced[1] | 2023 (planned)[1] | 200 MWac[1] | PV[1] | 8minute Solar Energy[1] | 8minute Solar Energy[1] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Aratina Solar Center
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Boron, San Bernardino County, California, United States[1] | 34.988, -117.5716 (exact)[1] |
2 | Mojave, Kern County, California, United States[1] | 35.063, -118.0878 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.
- ↑ 2.0 2.1 "Aratina Solar Center". Aratina Solar Center. Archived from the original on January 25, 2022. Retrieved February 14, 2022.