Arida Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Arida Solar is an announced solar photovoltaic (PV) farm in Laughlin, Clark County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Arida Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Announced[1] | 2027 (planned)[1] | 370 MWac[1] | PV[1] | Avantus [100%][2] | Avantus[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Arida Solar
Location | Coordinates (WGS 84) |
---|---|
Laughlin, Clark County, Nevada, United States[1] | 35.0920, -114.6888 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://web.archive.org/web/20220207222509/https://apnews.com/article/687a2455eb604cf3a7c726a6b929778e. Archived from the original on 07 February 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.eia.gov/electricity/data/eia860m/ https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/, https://www.eia.gov/electricity/data/eia860m/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)