Arida Solar

From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project.

Arida Solar is an announced solar farm in Laughlin, Clark County, Nevada, United States.


Project Details

The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Arida Solar

Phase name Status Commissioning year Nameplate capacity Owner Operator
1 Announced[1] 2023 (planned)[1] 370 MWac[1] 8minute Solar[2] 8minute Solar[1]

Location

Table 2: Phase-level location details for Arida Solar

Phase name Location Coordinates (WGS 84)
1 Laughlin, Clark County, Nevada, United States[1] 35.092, -114.689 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Retrieved May 21, 2021.
  2. "Clean Energy Bill Could Be A Boon For Laughlin: Southlands Seen As Prime Location For Solar Fields; Abandoned Ordnance Could Delay Development". Ap News. May 1, 2019. Archived from the original on February 7, 2022. Retrieved February 14, 2022.