Aries coal project

From Global Energy Monitor
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor.
Sub-articles:

The Aries Coal Project is a proposed opencast mine, operated by Ram River Coal, set to produce 4 million tonnes per annum, near Rocky Mountain House, Alberta, Canada.[1]

Location

The map below shows the approximate location of the proposed project.[1]

Loading map...

Background

Ram River Coal intends to ship the coking coal to two of the major western Canadian coal terminals; Westshore Terminals and Ridley Terminals.[1]

Project Details

  • Owner: Ram River Coal[1]
  • Parent company:
  • Location: Rocky Mountain House, Alberta, Canada[1]
  • GPS coordinates: 52.400401, -114.830002 (approximate)[1]
  • Mine status: Proposed[1]
  • Production: 4 million tonnes per annum[1]
  • Mineable reserves: 183 million tonnes[1]
  • Coal type: Metallurgical, Bituminous[1]
  • Mine size:
  • Mine type: Surface[1]
  • Start year: TBD
  • Life of Mine: 33 years[1]
  • Equipment:
  • Number of employees:

Articles and resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 Ram River Coal, Aires Project, Company Website, accessed August 2020

Related SourceWatch articles

External resources

External articles