Arizona & Honorato wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Arizona & Honorato wind farm (local name: Complexo Eólico Arizona e Honorato) is an operating wind farm in Sento Sé, Região Geográfica Intermediária de Juazeiro, Bahia, Brazil.
Project Details
Table 1: Phase-level project details for Arizona & Honorato wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|---|
Serra do fogo | Operating[1] | 2020[1][2] | 31 MW[1][3] | Onshore | Brennand Energia[4] | Pedra Branca S.A.[4][1] |
Serra do vento | Operating[1] | 2020[1][2] | 31 MW[1][3] | Onshore | Brennand Energia[4] | Pedra Branca S.A.[4][1] |
Umburana de cheiro | Operating[1] | 2020[1][2] | 31 MW[1][3] | Onshore | Brennand Energia[4] | Pedra Branca S.A.[4][1] |
Location
Table 2: Phase-level location details for Arizona & Honorato wind farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
Serra do fogo | Sento Sé, Região Geográfica Intermediária De Juazeiro, Bahia, Brazil[1][3] | -9.8051, -41.0227 (exact)[1] |
Serra do vento | Sento Sé, Região Geográfica Intermediária De Juazeiro, Bahia, Brazil[1][3] | -9.816, -41.0389 (exact)[1] |
Umburana de cheiro | Sento Sé, Região Geográfica Intermediária De Juazeiro, Bahia, Brazil[1][3] | -9.8355, -41.0427 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 "Informações De Geração - Aneel". Aneel. Archived from the original on
|archive-url=
requires|archive-date=
(help). Retrieved November 17, 2021. - ↑ 2.0 2.1 2.2 "(Brennand) Complexo Arizona E Honorato - Parques Serra Do Fogo E Umburana De Cheiro + Rotor Up". Archived from the original on September 9, 2021. Retrieved November 17, 2021.
- ↑ 3.0 3.1 3.2 3.3 3.4 3.5 "Brennand Energia". Brennandenergia. Archived from the original on September 10, 2021. Retrieved November 17, 2021.
- ↑ 4.0 4.1 4.2 4.3 4.4 4.5 "www.ons.org.br/%2FMPO%2FDocumento%20Normativo%2F5.%20Ajustamentos%20Operativos%20-%20SM%205.14%2F5.2.%20Regi%C3%A3o%20Nordeste%2F5.2.5.%20%C3%81rea%20230%20kV%20Sudoeste%2FAO-CE.NE.2SO_Rev.01.pdf" (PDF). Archived from the original (PDF) on September 10, 2021. Retrieved November 17, 2021.