Arkadikos Helios solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Megalopolis, Megales Lakkes

Arkadikos Helios solar farm (Αρκαδικος Ηλιος) is a solar photovoltaic (PV) farm under construction in Municipal Unit of Megalopoli, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece.

Project Details

Table 1: Phase-level project details for Arkadikos Helios solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Construction[1][2] 2023 (planned)[3] 39 MWp/dc[2] PV[2] Public Power Corporation of Greece (PPC) (ΔΕΗ Ανανεωσιμες ΑΕ)[4][1] GEK Terna[5]
2 Construction[1][2] 2023 (planned)[3] 11 MWp/dc[2] PV[2] Public Power Corporation of Greece (PPC) (ΔΕΗ Ανανεωσιμες ΑΕ)[4][1] GEK Terna[5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Arkadikos Helios solar farm

Phase Name Location Coordinates (WGS 84)
1 Municipal Unit of Megalopoli, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece[2] 37.3831, 22.1330 (exact)[2]
2 Municipal Unit of Megalopoli, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece[2] 37.3872, 22.1376 (exact)[2]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 https://www.ppcr.gr/en/solar-under-construction/arkadikos-helios-i-megalopoli. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 https://geo.rae.gr/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.michanikos.gr/index/articles/%CE%B5%CE%BD%CE%AD%CF%81%CE%B3%CE%B5%CE%B9%CE%B1-%CE%B1%CF%80%CE%B5/%CE%B4%CE%B5%CE%B7-%CE%B1%CE%BD-%CE%BF%CE%BB%CE%BF%CE%BA%CE%BB%CE%B7%CF%81%CF%8E%CE%BD%CE%BF%CE%BD%CF%84%CE%B1%CE%B9-%CE%B5%CE%BD%CF%84%CF%8C%CF%82-%CF%84%CE%BF%CF%85-2023-%CE%BF%CE%BA%CF%84%CF%8E-%CF%86%CF%89%CF%84%CE%BF%CE%B2%CE%BF%CE%BB%CF%84%CE%B1%CF%8A%CE%BA%CE%AC-%CF%83%CF%85%CE%BD%CE%BF%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%B9%CF%83%CF%87%CF%8D%CE%BF%CF%82-415-mw-r13594/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://ypodomes.com/se-dimopratisi-apo-ti-deian-dyo-fotovoltaikoi-stathmoi-50mw-sti-megalopoli/. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://balkangreenenergynews.com/ppc-renewables-picks-terna-to-build-50-mw-solar-park-in-megalopolis/. {{cite web}}: Missing or empty |title= (help)