Arkadikos Helios solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Megales Lakkes, Megalopolis
Arkadikos Helios solar farm (Αρκαδικος Ηλιος) is a solar farm under construction in Municipal Unit of Megalopoli, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece.
Project Details
Table 1: Phase-level project details for Arkadikos Helios solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1][2] | 2023 (planned)[3] | 39 MWp/dc[2] | PV[2] | Public Power Corporation of Greece (PPC) (ΔΕΗ Ανανεωσιμες ΑΕ)[4][1] | GEK Terna[5] |
2 | Construction[1][2] | 2023 (planned)[3] | 11 MWp/dc[2] | PV[2] | Public Power Corporation of Greece (PPC) (ΔΕΗ Ανανεωσιμες ΑΕ)[4][1] | GEK Terna[5] |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Arkadikos Helios solar farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Municipal Unit of Megalopoli, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece[2] | 37.3831, 22.1330 (exact)[2] |
2 | Municipal Unit of Megalopoli, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece[2] | 37.3872, 22.1376 (exact)[2] |
The map below shows the exact locations of the solar farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://www.ppcr.gr/en/solar-under-construction/arkadikos-helios-i-megalopoli. Archived from the original on March 25, 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 https://geo.rae.gr/. Archived from the original on February 11, 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.michanikos.gr/index/articles/%CE%B5%CE%BD%CE%AD%CF%81%CE%B3%CE%B5%CE%B9%CE%B1-%CE%B1%CF%80%CE%B5/%CE%B4%CE%B5%CE%B7-%CE%B1%CE%BD-%CE%BF%CE%BB%CE%BF%CE%BA%CE%BB%CE%B7%CF%81%CF%8E%CE%BD%CE%BF%CE%BD%CF%84%CE%B1%CE%B9-%CE%B5%CE%BD%CF%84%CF%8C%CF%82-%CF%84%CE%BF%CF%85-2023-%CE%BF%CE%BA%CF%84%CF%8E-%CF%86%CF%89%CF%84%CE%BF%CE%B2%CE%BF%CE%BB%CF%84%CE%B1%CF%8A%CE%BA%CE%AC-%CF%83%CF%85%CE%BD%CE%BF%CE%BB%CE%B9%CE%BA%CE%AE%CF%82-%CE%B9%CF%83%CF%87%CF%8D%CE%BF%CF%82-415-mw-r13594/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://ypodomes.com/se-dimopratisi-apo-ti-deian-dyo-fotovoltaikoi-stathmoi-50mw-sti-megalopoli/. Archived from the original on March 25, 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://balkangreenenergynews.com/ppc-renewables-picks-terna-to-build-50-mw-solar-park-in-megalopolis/. Archived from the original on January 31, 2022.
{{cite web}}
: Missing or empty|title=
(help)