Arla solar farm

From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project.

Arla solar farm is an announced solar farm in Ebberup, Assens, Denmark.


Project Details

The solar farm has four phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Arla solar farm

Phase name Status Commissioning year Nameplate capacity Owner Operator
1 Announced[1] 2023 (planned)[1] 62 MW[1][2] Better Energy[1][3] Better Energy[1][3]
2 Announced[1] 2024 (planned)[1] 62 MW[1][2] Better Energy[1][3] Better Energy[1][3]
3 Announced[1] 2024 (planned)[1] 62 MW[1][2] Better Energy[1][3] Better Energy[1][3]
4 Announced[1] 2024 (planned)[1] 62 MW[1][2] Better Energy[1][3] Better Energy[1][3]

Location

Table 2: Phase-level location details for Arla solar farm

Phase name Location Coordinates (WGS 84)
1 Ebberup, Assens, Denmark[1] 55.2434, 9.9735 (approximate)[1]
2 Denmark 55.6702, 10.3333 (approximate)[1][3]
3 Denmark 55.6702, 10.3333 (approximate)[1][3]
4 Denmark 55.6702, 10.3333 (approximate)[1][3]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 "Arla And Better Energy Sign Record Green Ppa On Four Solar Parks". Better Energy. Archived from the original on February 1, 2022. Retrieved March 15, 2022.
  2. 2.0 2.1 2.2 2.3 https://iopscience.iop.org/article/10.1088/1757-899X/471/10/102004/pdf. Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 "What We Do". Better Energy. Archived from the original on March 11, 2022. Retrieved March 15, 2022.