Armadillo Solar Center
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Armadillo Solar Center is a cancelled solar photovoltaic (PV) farm in Corsicana, Navarro County, Texas, United States.
Project Details
Table 1: Phase-level project details for Armadillo Solar Center
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Cancelled[1] | 175 MWac[1] | PV[1] | Ørsted A/S[2] | Ørsted A/S[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Armadillo Solar Center
Location | Coordinates (WGS 84) |
---|---|
Corsicana, Navarro County, Texas, United States[3] | 32.0001, -96.2027 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022.
{{cite web}}
: Check date values in:|archive-date=
(help) - ↑ 2.0 2.1 https://armadillosolarcenter.com/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.