Arriello wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Arriello wind farm is an operating wind farm in Vilafranca / Villafranca del Cid, Castelló / Castellón, Valencian Community, Spain.


Project Details

Table 1: Phase-level project details for Arriello wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
1 Operating[1] 2006[2] 50[1] Onshore Acciona Energía [50%]; Med Wind [50%][2][3] Energias Renovables Mediterráneas SA[1]
2 Operating[4] 2022[5] 35[6] Onshore Acciona Energía; Med Wind[6] Energias Renovables Mediterráneas SA[5]


Location

Table 2: Phase-level location details for Arriello wind farm

Phase name Location Coordinates (WGS 84)
1 Vilafranca / Villafranca del Cid, Castelló / Castellón, Valencian Community, Spain[7] 40.4664, -0.2146 (exact)[7]
2 Castellfort, Castellón, Valencia, Spain[6] 40.4682, -0.2119 (exact)[4]

The map below shows the exact locations of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "Mapa De Parques Eólicos". Asociación Empresarial Eólica. Archived from the original on October 8, 2021. Retrieved November 29, 2021.
  2. 2.0 2.1 "procoazrbolsast01.blob.core.windows.net/media/gjmaeaw2/acciona-energ%C3%ADa-capital-markets-day-presentation.pdf" (PDF). Archived from the original (PDF) on September 10, 2021. Retrieved November 29, 2021.
  3. "Med Wind, La Eólica De Fernando Roig, Sale De Pérdidas Y Gana 9,5 Millones". Expansión. August 18, 2016. Archived from the original on October 8, 2021. Retrieved November 29, 2021.
  4. 4.0 4.1 https://web.archive.org/web/20221023064142/https://www.thewindpower.net/windfarm_en_2465_arriello.php. Archived from the original on October 23, 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 "Los Nuevos Parques Eólicos De Castellón Estarán En Funcionamiento En Dos Años". El Periódico Mediterráneo. July 21, 2020. Archived from the original on October 8, 2021. Retrieved November 30, 2021.
  6. 6.0 6.1 6.2 https://cindi.gva.es/es/web/energia/castello/-/asset_publisher/3VvshcPfuBSo/content/ares-del-maestre-villafranca-del-cid-y-castlellfort-parque-eolico-arriello-ii-34-5-mw-solicitudes-de-autorizacion-de-implantacion-en-suelo-no-urbaniza. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 "Arriello (Spain)". The Wind Power. Archived from the original on October 7, 2021. Retrieved November 29, 2021.