Arriello wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Arriello wind farm is an operating wind farm in Vilafranca / Villafranca del Cid, Castelló / Castellón, Valencian Community, Spain.
Project Details
Table 1: Phase-level project details for Arriello wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2006[2] | 50[1] | Onshore | Acciona Energía [50%]; Med Wind [50%][2][3] | Energias Renovables Mediterráneas SA[1] |
2 | Operating[4] | 2022[5] | 35[6] | Onshore | Acciona Energía; Med Wind[6] | Energias Renovables Mediterráneas SA[5] |
Location
Table 2: Phase-level location details for Arriello wind farm
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Vilafranca / Villafranca del Cid, Castelló / Castellón, Valencian Community, Spain[7] | 40.4664, -0.2146 (exact)[7] |
2 | Castellfort, Castellón, Valencia, Spain[6] | 40.4682, -0.2119 (exact)[4] |
The map below shows the exact locations of the wind farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 "Mapa De Parques Eólicos". Asociación Empresarial Eólica. Archived from the original on October 8, 2021. Retrieved November 29, 2021.
- ↑ 2.0 2.1 "procoazrbolsast01.blob.core.windows.net/media/gjmaeaw2/acciona-energ%C3%ADa-capital-markets-day-presentation.pdf" (PDF). Archived from the original (PDF) on September 10, 2021. Retrieved November 29, 2021.
- ↑ "Med Wind, La Eólica De Fernando Roig, Sale De Pérdidas Y Gana 9,5 Millones". Expansión. August 18, 2016. Archived from the original on October 8, 2021. Retrieved November 29, 2021.
- ↑ 4.0 4.1 https://web.archive.org/web/20221023064142/https://www.thewindpower.net/windfarm_en_2465_arriello.php. Archived from the original on October 23, 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Los Nuevos Parques Eólicos De Castellón Estarán En Funcionamiento En Dos Años". El Periódico Mediterráneo. July 21, 2020. Archived from the original on October 8, 2021. Retrieved November 30, 2021.
- ↑ 6.0 6.1 6.2 https://cindi.gva.es/es/web/energia/castello/-/asset_publisher/3VvshcPfuBSo/content/ares-del-maestre-villafranca-del-cid-y-castlellfort-parque-eolico-arriello-ii-34-5-mw-solicitudes-de-autorizacion-de-implantacion-en-suelo-no-urbaniza.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 "Arriello (Spain)". The Wind Power. Archived from the original on October 7, 2021. Retrieved November 29, 2021.