Arror Multipurpose Dam hydroelectric plant is a hydroelectric power plant in pre-construction in Keiyo North, Elgeyo-Marakwet County, Kenya.
Project Details
Table 1: Project details for Arror Multipurpose Dam hydroelectric plant
| Status | Commissioning year | Nameplate capacity | Owner |
|---|---|---|---|
| Pre-construction[1][2] | 2040 (planned)[3] | 60 MW[4] | Kerio Valley Development Authority[4] |
Location
Table 2: Location details for Arror Multipurpose Dam hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Keiyo North, Elgeyo-Marakwet County, Kenya[1] | Kerio River[1] | 0.7098, 35.6288 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://abirikenya.com/counties/elgeyo-marakwet-county/arrow-dam/.
{{cite web}}: Missing or empty|title=(help) - ↑ https://eastleighvoice.co.ke/national/81864/construction-of-stalled-itare-arror-dams-resumes-next-year-water-cs-says.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://tenders.go.ke/storage/Documents/1746628868654-addendum-1.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://kvda.go.ke/arror-multipurpose-dam-project/.
{{cite web}}: Missing or empty|title=(help)