Arrow Canyon Solar Hybrid
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Arrow Canyon Solar Hybrid is an operating solar photovoltaic (PV) farm in Moapa, Clark County, Nevada, United States.
Project Details
Table 1: Phase-level project details for Arrow Canyon Solar Hybrid
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2022[1] | 200 MWac[2] | PV[2] | EDF Renewables [100%] (法國電力再生能源公司)[1] | EDF Renewables (法國電力再生能源公司)[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Arrow Canyon Solar Hybrid
Location | Coordinates (WGS 84) |
---|---|
Moapa, Clark County, Nevada, United States[2] | 36.4593, -114.8444 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240207170720/https://www.edf-re.com/project/arrow-canyon-solar/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help)