Arrowsmith Hydrogen Project wind farm

From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project.

Arrowsmith Hydrogen Project wind farm is a wind farm under construction in Dongara, Western Australia, Australia.


Project Details

Table 1: Phase-level project details for Arrowsmith Hydrogen Project wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
1 Construction[1] 2022 (planned)[1] 90 MW[1] Onshore Infinite Blue Energy[2] Infinite Blue Energy[2]

Location

Table 2: Phase-level location details for Arrowsmith Hydrogen Project wind farm

Phase name Location Coordinates (WGS 84)
1 Dongara, Western Australia, Australia[3] -29.2515, 114.931 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "Arrowsmith Hydrogen Plant stage 1". Infinite Blue Energy. Archived from the original on June 17, 2021. Retrieved June 22, 2021.
  2. 2.0 2.1 "Wind Map of Australia 2021" (PDF). ecogeneration. January 2021. Archived (PDF) from the original on November, 9, 2021. Retrieved June 7, 2021. Check date values in: |archive-date= (help)
  3. 3.0 3.1 "Arrowsmith Hydrogen Project Stage 1". HyResource. September 23, 2020. Archived from the original on January 14, 2021. Retrieved August 24, 2021.