Arroyo Solar Energy Storage Hybrid

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Arroyo Solar Energy Storage Hybrid is a solar farm under construction in Pueblo Pintado, McKinley County, New Mexico, United States.


Project Details

Table 1: Phase-level project details for Arroyo Solar Energy Storage Hybrid

Status Commissioning year Nameplate capacity Technology Owner Operator
Construction[1] 2023 (planned)[1] 300 MWac[1] PV[1] DE Shaw Renewable Investments (DESRI)[2] DE Shaw Renewable Investments (DESRI)[2]

Read more about solar capacity ratings.

Location

Table 2: Phase-level location details for Arroyo Solar Energy Storage Hybrid

Location Coordinates (WGS 84)
Pueblo Pintado, McKinley County, New Mexico, United States[1] 35.9703, -107.5631 (exact)[1]

The map below shows the exact location of the solar farm phase:

Loading map...


Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.
  2. 2.0 2.1 "New Mexico'S Largest Solar-Plus-Storage Plant In Utility Coal Retirement Plan Acquired By De Shaw". Energy Storage News. September 21, 2021. Archived from the original on November 30, 2021. Retrieved February 14, 2022.