Asopia solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Masdar-Taaler Beotia

Asopia solar farm (Ασωπια) is a solar photovoltaic (PV) farm in pre-construction in Municipal Unit of Inofyta, Regional Unit of Boeotia, Central Greece, Thessaly and Central Greece, Greece.

Project Details

Table 1: Phase-level project details for Asopia solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2023 (planned)[2] 65 MWp/dc[1][3] PV[1] Masdar Taaleri Generation (MTG) (Κυοτο Α.Ε.)[1][4] Masdar Taaleri Generation (MTG)[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Asopia solar farm

Location Coordinates (WGS 84)
Municipal Unit of Inofyta, Regional Unit of Boeotia, Central Greece, Thessaly and Central Greece, Greece[1] 38.2775, 23.5473 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://geo.rae.gr/. {{cite web}}: Missing or empty |title= (help)
  2. https://www.constructionweekonline.com/business/272168-masdar-marks-first-investment-in-greece-with-65mw-solar-project. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220303193853/https://renewablesnow.com/news/masdar-taaleri-get-ec-nod-for-greek-solar-jv-749809/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://balkangreenenergynews.com/eu-approves-masdar-taaleris-65-mw-solar-power-joint-venture-in-greece/. {{cite web}}: Missing or empty |title= (help)