Assembly Solar Project

From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project.

Assembly Solar Project is an operating solar farm in Shiawassee County, Michigan, United States.


Project Details

The solar farm has three phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Assembly Solar Project

Phase name Status Commissioning year Nameplate capacity Owner
1 Operating[1] 2020[1] 50 MWac[1] Ranger Power[2]
2 Construction[1] 110 MWac[1] Ranger Power[2]
3 Construction[3] 79 MWac[1] Ranger Power[2]

Location

Table 2: Phase-level location details for Assembly Solar Project

Phase name Location Coordinates (WGS 84)
1 Shiawassee County, Michigan, United States[1] 43.0227, -83.9453 (exact)[1]
2 Lennon, Shiawassee County, Michigan, United States[1] 43.0437, -83.96 (approximate)[1]
3 Lennon, Shiawassee County, Michigan, United States[1] 43.0227, -83.9427 (approximate)[1]

The maps below show the locations of the solar farm phases:

Phase 1 in Michigan, United States (exact location).

Loading map...

The map below shows the approximate locations of the solar farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Retrieved May 21, 2021.
  2. 2.0 2.1 2.2 "www.assemblysolar.com/". Archived from the original on November 21, 2021. Retrieved February 14, 2022.
  3. "Electricity". EIA. Archived from the original on February 7, 2022. Retrieved February 14, 2022.