Atrisco solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Atrisco solar farm is a solar photovoltaic (PV) farm under construction in Bernalillo County, New Mexico, United States.
Project Details
Table 1: Phase-level project details for Atrisco solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Construction[1] | 2024 (planned)[1] | 400 MWac[2] | PV[2] | Clenera LLC [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Atrisco solar farm
Location | Coordinates (WGS 84) |
---|---|
Bernalillo County, New Mexico, United States[1] | 35.1968, -106.9326 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240207170830/https://enlightenergy.co.il/project/atrisco/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240201180827/https://www.clenera.com/news/new-mexico-public-regulation-commission-joint-application-for-location-approval. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)