Atyrau Oil Refinery power station (газотурбинная электростанция ТОО "Атырауский НПЗ") is a power station in pre-construction in Atyrau, Kazakhstan.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Atyrau Oil Refinery power station | Atyrau, Atyrau, Kazakhstan | 47.073528, 51.925696 (exact)[1] |
Unit-level coordinates (WGS 84):
- 1: 47.073528, 51.925696
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| 1 | Pre-construction[2][3][4][5][6] | fossil gas: natural gas[7] | 154[2][4][5] | gas turbine[8][2][7] | no[7][9] | 2026 (planned)[6][9][5] | not found | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Atyrau Oil Refinery LLP [100%][7][5] | National Company KazMunayGas JSC [99.0%]; unknown [1.0%] |
Project-level captive use details
- Captive industry use (heat or power): power[10][7][9]
- Captive industry: Oil & Refining[10][7][9]
- Non-industry use: power[10][7][9]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The plant will be built next to the Atyrau Oil Refinery to provide reliability of electricity supply for the refinery.[11][12] According to the 2035 Electric Power Industry Development Plan released by the Ministry of Energy of Kazakhstan in February 2024, the oil refinery will secure financing for the construction on its own. The power station will have a capability to operate in an isolated mode.[13]
In July 2024, the project was listed in the National Infrastructure Plan of the Republic of Kazakhstan until 2029. According to the document, the plant will be commissioned in 2026. The cost of the project is estimated at KZT 110 billion.[14] In August 2024, negotiations were underway regarding the establishment of partnership agreements.[12]
The construction of the unit was mentioned in the media as a planned project in September 2025.[15] As of April 2026, there have been no further updates.
Articles and Resources
References
- ↑ https://www.google.com/maps/search/atyrau+oil+refinery/@47.0747273,51.9143918,15z?entry=ttu.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20250227234726/https://energyland.info/news-show--neftegaz-259610. Archived from the original on 2025-02-27.
{{cite web}}: Missing or empty|title=(help) - ↑ "Не виновен, пока не доказано обратное: В Атырау судят экс-гендиректора АНПЗ". Ақ Жайық. 2024-08-12. Archived from the original on 2025-04-03. Retrieved 2025-04-01.
- ↑ 4.0 4.1 https://pricom.kz/gorod/proekt-za-proektom-raboty-idut.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 "План мероприятий по развитию электроэнергетической отрасли Казахстана до 2035 года". gov.kz. 2024-02-20. Archived from the original on 2024-04-17. Retrieved April 4, 2024.
- ↑ 6.0 6.1 https://adilet.zan.kz/rus/docs/P2400000606.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 https://24.kz/ru/news/social/item/621064-novuyu-gazoturbinnuyu-ustanovku-postroyat-v-atyrauskoj-oblasti.
{{cite web}}: Missing or empty|title=(help) - ↑ https://tengrinews.kz/kazakhstan_news/kakie-proektyi-vnedryayutsya-na-atyirauskom-npz-512165/.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 9.2 9.3 9.4 https://web.archive.org/web/20231019145120/https://pricom.kz/obshhestvo/chto-bylo-skazano-o-tek.html. Archived from the original on 2023-10-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 https://ru.sputnik.kz/20231018/kazmunaygaz-vmeste-s-kitayskoy-cncec-postroyat-elektrostantsiyu-na-atyrauskom-npz-39450980.html.
{{cite web}}: Missing or empty|title=(help) - ↑ "Что было сказано о ТЭК (Russian)". pricom.kz. October 10, 2024. Retrieved October 20, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ 12.0 12.1 "Атырауский НПЗ построит газотурбинную электростанцию мощностью 154 МВт (Russian)". energyland.info. August 5, 2024. Retrieved October 30, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20240417003056/https://www.gov.kz/memleket/entities/energo/documents/details/611688?lang=ru. Archived from the original on 17 April 2024.
{{cite web}}: Missing or empty|title=(help) - ↑ "Об утверждении Национального инфраструктурного плана Республики Казахстан до 2029 года (Russian)". Adilet. July 25, 2024. Retrieved October 30, 2024.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Проект за проектом – работы идут". pricom.kz. September 4, 2025. Retrieved September 11, 2025.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.