Aubigeon wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Les Pelures Blanches

Aubigeon wind farm is an operating wind farm in Indre, Centre-Loire Valley, France.

Project Details

Table 1: Phase-level project details for Aubigeon wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Operating[1] 2015[1] 12 MW[1] Onshore[2] RIVE Private Investment[3] TTR Energy; Nordex[4]

Location

Table 2: Phase-level location details for Aubigeon wind farm

Location Coordinates (WGS 84)
Indre, Centre-Loire Valley, France[1] 47.0376, 1.9997 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.openstreetmap.org/relation/7320893. {{cite web}}: Missing or empty |title= (help)
  2. https://data.open-power-system-data.org/renewable_power_plants/2020-08-25/renewable_power_plants_FR.csv. {{cite web}}: Missing or empty |title= (help)
  3. https://www.windpowerengineering.com/nordex-delivers-turn-key-wind-farms-france/. {{cite web}}: Missing or empty |title= (help)
  4. https://www.thewindpower.net/windfarm_en_21714.php. {{cite web}}: Missing or empty |title= (help)