Aubigeon wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Les Pelures Blanches
Aubigeon wind farm is an operating wind farm in Indre, Centre-Loire Valley, France.
Project Details
Table 1: Phase-level project details for Aubigeon wind farm
Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2015[1] | 12[1] | Onshore | RIVE Private Investment[2] | TTR Energy; Nordex[3] |
Location
Table 2: Phase-level location details for Aubigeon wind farm
Location | Coordinates (WGS 84) |
---|---|
Indre, Centre-Loire Valley, France[1] | 47.0376, 1.9997 (exact)[1] |
The map below shows the exact location of the wind farm:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Parc éolien d'Aubigeon (7320893)". OpenStreetMap. Archived from the original on July 20, 2021. Retrieved August 24, 2021.
- ↑ "Nordex delivers turn key wind farms to France". Windpower Engineering & Development. Archived from the original on July 20, 2021. Retrieved August 23, 2021.
- ↑ "Aubigeon (France)". Archived from the original on July 20, 2021. Retrieved August 23, 2021.