Ayia Triada solar farm (Αγια Τριαδα) is a solar photovoltaic (PV) farm in pre-construction in Larisa Regional Unit, Thessaly, Greece.
Project Details
Table 1: Phase-level project details for Ayia Triada solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
11 | Pre-construction[1] | 36.3 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
1A | Pre-construction[1] | 26 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
1B | Pre-construction[1] | 64 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
2 | Pre-construction[1] | 20 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
3B | Pre-construction[1] | 25 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
4,5,6 A | Pre-construction[1] | 25 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
4,5,6 B | Pre-construction[1] | 25 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
7B | Pre-construction[1] | 35 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
8 | Pre-construction[1] | 4.2 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
9A | Pre-construction[1] | 3.2 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
9B | Cancelled[1] | 20 MWp/dc[1] | PV[1] | Terna Energy [100%] (Τερνα Ενεργειακη Ανωνυμη Βιομηχανικη Εμπορικη Τεχνικη Εταιρεια Α Ε)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Ayia Triada solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
11 | Larisa Regional Unit, Thessaly, Greece[1] | 39.3869, 22.5646 (exact)[1] |
1A | Larisa Regional Unit, Thessaly, Greece[1] | 39.3781, 22.5791 (exact)[1] |
1B | Larisa Regional Unit, Thessaly, Greece[1] | 39.3805, 22.5848 (exact)[1] |
2 | Larisa Regional Unit, Thessaly, Greece[1] | 39.4078, 22.5695 (exact)[1] |
3B | Larisa Regional Unit, Thessaly, Greece[1] | 39.3876, 22.5526 (exact)[1] |
4,5,6 A | Larisa Regional Unit, Thessaly, Greece[1] | 39.3683, 22.5949 (exact)[1] |
4,5,6 B | Larisa Regional Unit, Thessaly, Greece[1] | 39.3859, 22.5654 (exact)[1] |
7B | Larisa Regional Unit, Thessaly, Greece[1] | 39.3872, 22.5552 (exact)[1] |
8 | Larisa Regional Unit, Thessaly, Greece[1] | 39.4048, 22.577 (exact)[1] |
9A | Larisa Regional Unit, Thessaly, Greece[1] | 39.3741, 22.5622 (exact)[1] |
9B | Larisa Regional Unit, Thessaly, Greece[1] | 39.3836, 22.5581 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 1.49 1.50 1.51 1.52 1.53 1.54 https://web.archive.org/web/20240301134205/https://geo.rae.gr/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help)