Ayioi Anaryeroi solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Ayioi Anaryeroi solar farm (Αγιοι Αναργυροι 3, Αγιοι Αναργυροι 1) is a solar farm in pre-construction in Florina Regional Unit, Western Macedonia, Epirus and Western Macedonia, Greece.


Project Details

Table 1: Phase-level project details for Ayioi Anaryeroi solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Pre-construction[1] 2024 (planned)[2] 40 MWp/dc[1] PV[1] Menton Energy (Αμυνταιο Φ.Β Παρκο Τεσσερα Μονοπροσωπη Α.Ε.)[1]
3 Pre-construction[2][1] 2024 (planned)[2] 24 MWp/dc[1] PV[1] Menton Energy (Αμυνταιο Φ.Β Παρκο Δυο Μονοπροσωπη Α.Ε.)[2][1]

Read more about solar capacity ratings.


Location

Table 2: Phase-level location details for Ayioi Anaryeroi solar farm

Phase name Location Coordinates (WGS 84)
1 Florina Regional Unit, Western Macedonia, Epirus and Western Macedonia, Greece[1] 40.5903, 21.6404 (exact)[1]
3 Florina Regional Unit, Western Macedonia, Epirus and Western Macedonia, Greece[1] 40.6004, 21.6207 (exact)[1]

The map below shows the exact locations of the solar farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 https://geo.rae.gr/. Archived from the original on February 11, 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20230202191548/https://renews.biz/83404/rwe-ppc-reach-fid-on-175mw-of-greek-solar/. Archived from the original on February 02, 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)