Ayios Panteleemon-Soteros solar farm

From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project.

Ayios Panteleemon-Soteros solar farm (local name: Αγιος Παντελεημων-Σωτηρος) is a solar farm under development in Florina Regional Unit, Western Macedonia, Epirus and Western Macedonia, Greece.


Project Details

The solar farm has one phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Ayios Panteleemon-Soteros solar farm

Status Nameplate capacity Owner
Development[1] 37 MWp/dc[1] Perenas Photovoltaics Single Member Private Company (Local Script: Φωτοβολταικα Πυρηνας Μονοπροσωπη Ι Κ Ε)[1]

Location

Table 2: Phase-level location details for Ayios Panteleemon-Soteros solar farm

Location Coordinates (WGS 84)
Florina Regional Unit, Western Macedonia, Epirus And Western Macedonia, Greece[1] 40.7319, 21.745 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://geo.rae.gr/. Missing or empty |title= (help)