Ayios Petros Valtetsi wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Ayios Petros Valtetsi wind farm (Αγιος Πετρος-Βαλτετσι-Νεστανη-Τσεμπερου) is a wind farm in pre-construction in Municipal Unit Of Tegea, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece.
Project Details
Table 1: Phase-level project details for Ayios Petros Valtetsi wind farm
| Status | Nameplate capacity | Type | Owner |
|---|---|---|---|
| Pre-construction[1] | 298.2 MW[1] | Onshore[1] | Volton Hellenic Energy SA [100%] (Volton_Ελληνικη_Ενεργειακη Αε)[1] |
Location
Table 2: Phase-level location details for Ayios Petros Valtetsi wind farm
| Location | Coordinates (WGS 84) |
|---|---|
| Municipal Unit Of Tegea, Arcadia Regional Unit, Peloponnese Region, Peloponnese, Western Greece and the Ionian, Greece[1] | 37.4629, 22.4209 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help)
