Ayora (Grenergy) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Ayora (Grenergy) solar farm (Parque fotovoltaico Ayora) is a solar photovoltaic (PV) farm under construction in Ayora, Valencia, Valencian Community, Spain.
Project Details
Table 1: Phase-level project details for Ayora (Grenergy) solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1] | 2026 (planned)[2] | 154.7 MWac[3] | PV[4] | Grenergy [100%][5] | PV I Ataulfo[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Ayora (Grenergy) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Ayora, Valencia, Valencian Community, Spain[3] | 38.9778, -1.1550 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ "RESULTS PRESENTATION - 1H23 RESULTS" (PDF). Grenergy. 2023-09-27. Archived from the original (PDF) on 2024-03-25.
- ↑ https://www.power-technology.com/data-insights/power-plant-profile-ayora-1-solar-pv-park-spain/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 "BOE-A-2023-11794 Resolución de 23 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a PV I Ataulfo, SL, autorización administrativa previa para la planta solar fotovoltaica "PSF Ayora 1", de 154,665 MW". Boletín Oficial del Estado. 2023-05-18. Archived from the original on 2024-02-19. Retrieved 2024-02-13.
- ↑ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-1933, https://www.pv-magazine.es/2023/01/25/el-miteco-y-la-mayoria-de-cc-aa-consiguen-tramitar-a-tiempo-todos-los-permisos-que-vencian-hoy/ https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-11794, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-1933, https://www.pv-magazine.es/2023/01/25/el-miteco-y-la-mayoria-de-cc-aa-consiguen-tramitar-a-tiempo-todos-los-permisos-que-vencian-hoy/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.pv-magazine.es/2023/01/25/el-miteco-y-la-mayoria-de-cc-aa-consiguen-tramitar-a-tiempo-todos-los-permisos-que-vencian-hoy/ https://grenergyus.com/wp-content/uploads/2024/01/gre-1h23-results-presentation-3.pdf, https://www.pv-magazine.es/2023/01/25/el-miteco-y-la-mayoria-de-cc-aa-consiguen-tramitar-a-tiempo-todos-los-permisos-que-vencian-hoy/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)