Az Zour North power plant (محطة شمال الزور ١ المستقلة للطاقة والمياه ، محطة الزور الشمالية لتوليد الطاقة الكهربائية) is a 1632-megawatt (MW) operating power station in Zour, Al Ahmadi, Kuwait, fueled by fuel oil and gas.
Project Details
Table 1: Unit-level details for Az Zour North power plant
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP[1] | Start year | Retired year |
---|---|---|---|---|---|---|---|
CC1-1 | operating[2] | fuel oil, gas[3][4][5] | 929 MW | combined cycle[2] | yes[3] | 2016[2] | – |
CC1-2 | operating[2] | fuel oil, gas[3][4] | 703 MW | combined cycle[2] | yes[3] | 2016[2] | – |
CC2 | pre-construction[6][7][8] | fuel oil, gas[9][8] | 1350 MW | combined cycle[7] | yes[10] | not found | – |
CC3 | pre-construction[6][11] | fuel oil, gas[9][8] | 1350 MW | combined cycle[7] | yes[10] | not found | – |
Table 2: Unit-level ownership details for Az Zour North power plant
Unit name | Operator | Owner | Parent |
---|---|---|---|
CC1-1 | – | Shamal Az Zour Al Oula KSC[100.0%][4][12] | Public (other)[50.0%]; Kuwait Investment Authority[5.0%]; Kuwait Public Institution for Social Security[5.0%]; Engie SA[17.5%]; Sumitomo Corporation[17.5%]; A.H. Al Sagar & Brothers[5.0%][12][13] |
CC1-2 | – | Shamal Az Zour Al Oula KSC[100.0%][4][12] | Public (other)[50.0%]; Kuwait Investment Authority[5.0%]; Kuwait Public Institution for Social Security[5.0%]; Engie SA[17.5%]; Sumitomo Corporation[17.5%]; A.H. Al Sagar & Brothers[5.0%][12][13] |
CC2 | – | Kuwait Authority for Partnership Projects (KAPP)[100.0%][14][7] | Kuwait Authority for Partnership Projects (KAPP)[100.0%][15] |
CC3 | – | Kuwait Authority for Partnership Projects (KAPP)[100.0%][14][7] | Kuwait Authority for Partnership Projects (KAPP)[100.0%][15] |
Plant-level captive use details for Az Zour North power plant power station
- Captive use: Power[16][17][10]
- Captive Industry: Chemicals[16][17][10]
- Non-industry use: Power[16][17][10]
Location
Table 3: Plant-level location details for Az Zour North power plant
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Az Zour North power plant | Zour, Al Ahmadi, Kuwait | 28.7135, 48.3806 (exact)[18][7] |
The map below shows the exact location of the power station.
Articles and Resources
Additional data
To access additional data, including an interactive map of gas-fired power plants, a downloadable dataset, and summary data, please visit the Global Gas Plant Tracker on the Global Energy Monitor website.
References
- ↑ CHP = Combined Heat and Power
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "www.mew.gov.kw/media/vx4bl5zu/%D9%83%D8%AA%D8%A7%D8%A8-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A6%D9%8A%D8%A9-2019.pdf" (PDF). Archived (PDF) from the original on July 9, 2021.
- ↑ 3.0 3.1 3.2 3.3 "www.power-technology.com/projects/az-zour-north-gas-fired-combined-cycle-power-plant/". Archived from the original on July 17, 2021.
- ↑ 4.0 4.1 4.2 4.3 "aznoula.com/". Archived from the original on June 25, 2021.
- ↑ (PDF) https://web.archive.org/web/20221208190059/https://www.mew.gov.kw/media/av5dglm5/%D9%83%D8%AA%D8%A7%D8%A8-%D8%A7%D9%84%D8%A7%D8%AD%D8%B5%D8%A7%D8%A1-%D8%A7%D9%84%D8%B3%D9%86%D9%88%D9%8A-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A6%D9%8A%D8%A9-2021_compressed.pdf.
{{cite web}}
:|archive-url=
requires|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 "energy-utilities.com/kuwait-sets-advisory-bid-deadline-for-major-iwpp-news083508.html". Archived from the original on August 13, 2021.
- ↑ 7.0 7.1 7.2 7.3 7.4 7.5 "www.kapp.gov.kw/Admin/DynamicFile.aspx?PHName=DownloadFile&PageID=1089&Published=1". Archived from the original on June 23, 2021. Retrieved January 21, 2022.
- ↑ 8.0 8.1 8.2 "www.kapp.gov.kw/en/Az-Zour-North-IWPP-(Phase-2)". Archived from the original on June 23, 2021.
- ↑ 9.0 9.1 "KAPP -- Kuwait Authority for Partnership Projects". Archived from the original on June 24, 2022. Retrieved July 11, 2022.
- ↑ 10.0 10.1 10.2 10.3 10.4 "www.mew.gov.kw/media/dm3dwvt0/%D9%83%D8%AA%D8%A7%D8%A8-%D8%A7%D9%84%D8%A7%D8%AD%D8%B5%D8%A7%D8%A1-%D8%A7%D9%84%D8%B3%D9%86%D9%88%D9%8A-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1-compressed.pdf" (PDF). Archived (PDF) from the original on May 21, 2021.
- ↑ "www.kapp.gov.kw/en/Az-Zour-North-IWPP-(Phase-3)". Archived from the original on June 24, 2021.
- ↑ 12.0 12.1 12.2 12.3 "www.nsenergybusiness.com/projects/az-zour-north-one-gas-fired-power-plant/". Archived from the original on May 9, 2021.
- ↑ 13.0 13.1 "Shamal Az-Zour - About Us". Shamal Az-Zour. Archived from the original on August 13, 2021. Retrieved January 20, 2022.
- ↑ 14.0 14.1 "www.globalmarketsinternational.com/latestmarketpost/kuwait-power-plant-projects-renewable-energy/". Archived from the original on June 23, 2021.
- ↑ 15.0 15.1 "MEW Kuwait". www.mew.gov.kw. Archived from the original on June 25, 2021. Retrieved January 20, 2022.
- ↑ 16.0 16.1 16.2 Cite error: Invalid
<ref>
tag; no text was provided for refs namedref_14
- ↑ 17.0 17.1 17.2 Cite error: Invalid
<ref>
tag; no text was provided for refs namedref_15
- ↑ "Reconnecting Asia Project Database". May 14, 2021. Archived from the original on December 24, 2020. Retrieved January 21, 2022.