Ba Ria power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Ba Ria power station is an operating power station of at least 389-megawatts (MW) in Long Hương, Ba Ria - Vung Tau, Vietnam with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Ba Ria power station Long Hương, Ba Ria - Vung Tau, Vietnam 10.48902, 107.16647 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 10.48902, 107.16647

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[2][3][4][5] gas[2] 389[2] combined cycle[6] not found 1999[6]
Unit 2 shelved[7][8][9] liquefied natural gas[7][8] 1200[7][8] not found not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 EVNGENCO 3[10] Vietnam Power Group [100.0%]
Unit 2 not found not found

Articles and Resources

References

  1. https://web.archive.org/web/20210310234427/https://www.industryabout.com/country-territories-3/2905-vietnam/fossil-fuels-energy/55180-ba-ria-gas-power-plant. Archived from the original on 10 March 2021. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20210311015310/https://en.evn.com.vn/userfile/User/huongbtt/files/2021/1/EVNAnnualReport2018.pdf. Archived from the original (PDF) on 11 March 2021. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20220709144121/https://www.genco3.com/Data/Sites/1/media/bao-cao-thuong-nien/2021/20210614_pgv_ar2020---en.pdf. Archived from the original (PDF) on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. (PDF) https://www.genco3.com/Data/Sites/1/media/bao-cao-thuong-nien/2022/annual-report-2021.pdf. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://www.genco3.com/Data/Sites/1/media/bao-cao-thuong-nien/2022/20230410-bctn-evngenco3---v4-final.pdf. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20220709130843/https://www.power-technology.com/marketdata/ba-ria-combined-cycle-power-plant-vietnam/. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://web.archive.org/web/20210825214815/https://en.vietnamplus.vn/ba-riavung-tau-seeks-to-develop-lngfueled-power-projects/166947.vnp. Archived from the original on 25 August 2021. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20220825184839/https://insightplus.bakermckenzie.com/bm/attachment_dw.action?attkey=FRbANEucS95NMLRN47z%2BeeOgEFCt8EGQJsWJiCH2WAXW59W9rh3JQVhTTX6lUEPU&nav=FRbANEucS95NMLRN47z%2BeeOgEFCt8EGQbuwypnpZjc4%3D&attdocparam=pB7HEsg%2FZ312Bk8OIuOIH1c%2BY4beLEAeMutoVCLInEs%3D&fromContentView=1. Archived from the original on 25 August 2022. {{cite web}}: Missing or empty |title= (help)
  9. https://vietnamenergy.vn/considering-to-supplement-long-son-power-center-to-the-npp-23819.html. {{cite web}}: Missing or empty |title= (help)
  10. https://web.archive.org/web/20221002062438/https://www.genco3.com/en-US/operations/production-business. Archived from the original on 02 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.