Bacupari-Pangaré wind farm

From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project.

Bacupari-Pangaré wind farm (local name: Complexo Eólico Bacupari – Pangaré) is a cancelled wind farm in Palmares do Sul, Rio Grande do Sul, Brazil.


Project Details

Table 1: Phase-level project details for Bacupari-Pangaré wind farm

Status Nameplate capacity Mount type Owner Operator
Cancelled (inferred November 2021) 155 MW[1][2] Onshore Elecnor[2] Enerfín do Brasil[1][2]

Location

Table 2: Phase-level location details for Bacupari-Pangaré wind farm

Location Coordinates (WGS 84)
Palmares Do Sul, Rio Grande Do Sul, Brazil[1][2] -30.258, -50.5098 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 "Fepam Licencia Novo Parque Eólico No Rio Grande Do Sul". Portal Do Estado Do Rio Grande Do Sul. August 8, 2016. Archived from the original on November 6, 2021. Retrieved November 17, 2021.
  2. 2.0 2.1 2.2 2.3 "To-The-Point: Brazil'S Rio Grande Do Sul Licenses 155-Mw Wind Project". Renewablesnow. Archived from the original on November 6, 2021. Retrieved November 17, 2021.