Badger State solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Badger State solar farm is a solar farm in pre-construction in Jefferson County, Wisconsin, United States.


Project Details

Table 1: Phase-level project details for Badger State solar farm

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2023 (planned)[2] 149 MWac[3] PV[4] Ranger Power[1]

Read more about solar capacity ratings.


Location

Table 2: Phase-level location details for Badger State solar farm

Location Coordinates (WGS 84)
Jefferson County, Wisconsin, United States[3] 43.1840, -88.9925 (approximate)[3]

The map below shows the approximate location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 Huebner, Tyler (January 30, 2020). ""Badger State Solar" Project In Jefferson County Gets Psc Approval". RENEW Wisconsin. Archived from the original on November 17, 2020. Retrieved February 14, 2022.
  2. https://www.tdworld.com/renewables/article/21172659/badger-state-solar-project-in-wisconsin-anticipated-to-be-in-service-in-late-2023. Archived from the original on August 18, 2021. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 "The Project". Badger State Solar. Archived from the original on December 21, 2021. Retrieved February 14, 2022.
  4. https://www.badgerstatesolar.com. Archived from the original on July 06, 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)