Baghdad South Combined Cycle power plant

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Baghdad South Combined Cycle power plant (محطة جنوب بغداد المركبة) is a power station in the pre-permit stage in Baghdad, Iraq.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Baghdad South Combined Cycle power plant Baghdad, Baghdad, Iraq 33.312805, 44.361488 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit GT-1 pre-permit[2] fossil gas - natural gas[2] 125[2] gas turbine[2] 2026[2]
Unit GT-2 pre-permit[3][4] fossil gas - natural gas[4] 125[4] gas turbine[5] 2026[2]
Unit GT-3 pre-permit[3][4] fossil gas - natural gas[4] 125[4] gas turbine[5] 2026[2]
Unit GT-4 pre-permit[3][4] fossil gas - natural gas[4] 125[4] gas turbine[5] 2026[2]
Unit GT-5 pre-permit[3][4] fossil gas - natural gas[4] 125[4] gas turbine[5] 2026[2]
Unit GT-6 pre-permit[3][4] fossil gas - natural gas[4] 125[4] gas turbine[5] 2026[2]
Unit ST-1 pre-permit[3][4] fossil gas - natural gas[4] 125[4] steam turbine[5] 2026[2]
Unit ST-2 pre-permit[3][4] fossil gas - natural gas[4] 125[4] steam turbine[5] 2026[2]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit GT-1 Ministry of Electricity (Iraq) [100.0%]
Unit GT-2 Ministry of Electricity (Iraq) [100.0%]
Unit GT-3 Ministry of Electricity (Iraq) [100.0%]
Unit GT-4 Ministry of Electricity (Iraq) [100.0%]
Unit GT-5 Ministry of Electricity (Iraq) [100.0%]
Unit GT-6 Ministry of Electricity (Iraq) [100.0%]
Unit ST-1 Ministry of Electricity (Iraq) [100.0%]
Unit ST-2 Ministry of Electricity (Iraq) [100.0%]

Articles and Resources

References

  1. https://www.google.com/maps/place/33%C2%B018'46.1%22N+44%C2%B021'41.4%22E/@33.31280544.359299317z/data=!3m1!4b1!4m5!3m4!1s0x0:0xc43c6a74a048962!8m2!3d33.312805!4d44.361488. {{cite web}}: Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 https://web.archive.org/web/20220709115043/https://www.power-technology.com/marketdata/baghdad-south-combined-cycle-power-plant-iraq/. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://www.seetao.com/details/51229.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 https://www.bncnetwork.net/project/Baghdad-South-1000MW-Combined-Cycle-Power-Plant/MTk2MzUx/. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 https://www.seetao.com/details/51230.html. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.