Bago 3 hydroelectric plant
From Global Energy Monitor
| Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Bago 3 hydroelectric plant is a hydroelectric power plant in pre-construction in Murcia, Negros Occidental, Philippines.
Project Details
Table 1: Project details for Bago 3 hydroelectric plant
| Status | Nameplate capacity | Technology type | Owner |
|---|---|---|---|
| Pre-construction[1] | 35 MW[1] | Run-of-river[2] | Alsons Energy Development Corporation[1] |
Location
Table 2: Location details for Bago 3 hydroelectric plant
| Location | River | Coordinates (WGS 84) |
|---|---|---|
| Murcia, Negros Occidental, Philippines[1] | Bago River[2] | 10.6067, 123.0396 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://legacy.doe.gov.ph/sites/default/files/pdf/renewable_energy/Awarded%20Hydropower%20as%20of%20April%202025.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 (PDF) https://r6.emb.gov.ph/wp-content/uploads/2025/03/AEDC-Bago3-Draft-EIS-Report.pdf.
{{cite web}}: Missing or empty|title=(help)
